Profile Picture

Aslat İnşaat Mek. Elekt. San. Ve Tic. Ltd. Şti.

room

Description

Tüm tadilat onarım ve taahhüt işleriniz için buradayız, sizleri bekliyoruz.

Aslat İnşaat Mek. Elekt. San. Ve Tic. Ltd. Şti., Turkey at your location and piles, Roofing and waterproofing, Iron and Steel, Paint and Equipment, Forest Products, Binding materials, Glass, Covering, Fireplaces and Stoves, Consumables, Coatings made, Coatings made, Coatings made, be put in place and making Iron works, Trapezoidal panel ribs PVC coating works, Fences made of, Fences made of, Fences made of, 1 Arm Wall Lamp Making and Replacing, Orders for furniture to be measured, Manufacture of plastic joinery done and instead position, and the replacement of windows and doors made, Color choices, False ceilings, Kadronl wall and ceiling coverings made of wood, Making Wood Masonry Wall, Laser cutting, Bending works, Kitchen cupboard, Mid-table manufacture, Aluminum joinery manufacturing and assembly done, Stair railings and handrails made of, Welding made railing, be put in place, Lay-system false ceilings, Seated system false ceilings, Hidden carrier systems false ceilings, Fonts from grill, cover, garguy done, applications, supply and the fixing of profile flooding, bending the sheet metal door frame construction and installation in place, supply and the replacement manhole, Stair railings made of, supply and the fixing of the PVC corner profile, Plinth supply and instead of detecting, Wood & Aluminum & PVC Window and Accessories, Wood & Aluminum & Steel & Fire Resistant Doors and Accessories, Fire & Thermal & Waterproofing Materials, Grids, Facade material, Vehicle Barrier, Parker & Marble & Ceramic Floor and Wall Coating PVC, Magnetic Tape and Card Reader, Vana - Motor Operated, Insulation - Piping, Pipe Supports - Engineering, Pipes & Fittings - PVDF, Pipes & Fittings - PP, Tourniquet, Vana - Manual, Raised Floor and Ceiling, Cameras - General & Accessories, Instead of mounting pvc transition profile., Installation of flexible PVC based plinth, supply and to put in place grid, demolition of buildings or structures, demolition of buildings or structures, Vitrified Materials and Accessories, Industrial & Explosion Proof Horn Speakers, Power Amplifier, Digital Video Recorder, cabling, cabling, TFT LCD Monitor, Roof & Wall Speakers, microphone, Pipes & Fittings - Ductile, Turning works, Milling works, Turnkey stone fencing, Pouring concrete fence, Installation of concrete fencing, Hinged revolving door frame to the source, Installation of the door frame and hinges sources, Fence foundation, Type wooden kitchen countertops made of six cabinet, Installation of sectional garage and industrial doors, removal of the steel structure, Removing the floor, Parker coating of, Decorative fences coating, Installation of metal fencing post, Turnkey metal fence pole, Key delivery wire mesh fence, Automation installation (roll), Installation of automation for sliding doors, Fence frame, Installation of automation for hinged doors, Installation of swing door, Installation of sliding door, Garage door installation, Turnkey wooden fencing, Cabinet, Cabinet Installation, kitchen decoration, Applications jobs, made of steel supply, Room, Transporting earthmoving, Transport of construction waste, Excavation, Fillers and bring to bring, Manufacture of furniture to size, Turnkey knit fence from bricks, wrought iron fence key delivery, Type wooden kitchen countertop cabinet made, Making carcass structure, Frame Building on Wall Covering Making, Galvanized Construction for greenhouses, Wardrobe, Aluminum construction for greenhouses, Preparation of all kinds of iron profile, Preparation of all kinds of iron profile, All kinds of profiles, made of steel frame construction, All kinds of profiles, made of steel frame construction, Dismantling of furniture, Steel arch / vault made, Steel arch / vault made, to be made and instead the Greenhouse, Pipes & Fittings - GRP, Pipes & Fittings - HDPE, concrete repair mortar for concrete repairs with Surface, Crack Repair With Epoxy Injection, Mortar or mud Horosan Karger Demolition, Removing wood frame, Removing slatted wooden flooring, Chiller, Venting and Drying Equipment, Fuel Oil Piping, Valve - Other, Condensate Pump, Recirculation Pump, Fuel Pump (Push & Offloading), Fire pump, Pumps - Other, Fuel Oil Heaters, General Engines, Removing the hardwood floors, Removing the skirting board, Removing the old parquet, Removing linoleum adhesive, Removing the window, Bath - Angle, remove paint from the wall, Fire Protection and Prevention Equipment & Accessories, HVAC Equipment and Accessories, Gas compressor, Fuel Gas & Oil Treatment and Discharge System, Waste Fuel Oil Conditioning System, Start Up and Performance Fuel Gas Heater, Wood Roof Removal, Filters, dilation, Chimney - Steel & Concrete, Roof truss made and put in place., Construction for greenhouses, Installation of underground septic tanks, Installation of the septic tank cover, Installation of the septic tank manhole cover, Wooden stairs to, stairs, stairs, Making Precast Concrete Manufacturing and assembly, Carrier slab construction with concrete slab elements, Wall made, Wall made, Wall made, laying of the sewer line, Removing the laminate, Global Surface Karger Building Mold Making, Channel Malzemer - General, vibration Reduction, Nuts & Bolts & Anchors, Heat Exchanger - Genel, Heater, By-pass Shaft, Steel Structure Systems, Projector installation and connection, Installation of Floor luminaires, flat faced concrete formwork made with Plywood, Making concrete with mold tunnel mold system, placing timber on the pier suspension, Carcass Making Work, Domes and vaults scaffold made of craftsmanship, Plant apartment to move, Pipes & Fittings - FRP, Blinds, curtains, Window Coverings, Ceiling and Wall Coverings, Pantry Cabinets and shelves, Washbasin taps, Wooden structures, Bathroom cabinets, Shower Cabins, Bathroom accessories, Installation of LED lamps, Bathroom faucets, Pipes & Fittings - Stainless Steel, Pipes & Fittings - PVC, Pipes & Fittings - Carbon Steel, Pipes & Fittings - Concrete, Vana - Relief, Roof & Wall Coverings and Sandwich Panels, Kitchen cabinets, Wallpapers, Bathroom fans, Faucets and spare parts, Bins and brushes, And Toilet Seat Covers, sinks, Siphones, Kitchen hoods, Built-in Kitchen Sets, Built-in Kitchen Sets, Kitchen tiles, Removing oil paint from a window sill, Removal of paint from surfaces, Removing the paint from the tube, remove the whitewash from the ceiling,, Removing the Sink, Removing the Sink, remove paint from the ceiling, Removing paint from Radyöter, Removing Panels, removing the wall made of plasterboard, demolition of brick or gypsum partition, Removing Brick, Removing the window sill, Removing the steel door, removing the screed 10 cm, Removing the inner door, Removing the timber liner, Kitchen Accessories, Evie batteries, Shells, Water filters and accessories, Water filters and accessories, Cooker hoods and extractor hood, Light steel structures, Removing the Toilet, Vana - Diafram, remove the wallpaper, plaster removal, Removal of tiles, Removing the battery, To remove the Bathroom, Valve - Fire Fighting, Facade scaffold made, the replacement windows done and, Roof made, Measuring Equipment, Insurance, Cables and wires, Plugs, Ventilation Systems, stabilizers, Tranformatörler, Enclosures, generators, generators, Lights, lifts, Air conditioners, Air conditioners, Configure Automatic number plate recognition module, Radiators, convectors, room, Split system, Drywall heating, Keys, Heat Storage Tanks, Pressure and temperature controls, Burners, boilers, Water Heaters, Fan Heaters, Stoves and Fireplaces, Circuit breakers, Sockets, Removing the sewer, Collector installation, Collector installation, Installing Kitchen doğrayıcıs, laying copper heating pipe, laying heating pipes Polypropylene, Laying metal and plastic heating pipes, laying copper pipes for water supply, Heating radiator assembly, Removing the gains from the ground, Sanitary shower installation, Place standing gas boiler installation up to 55 kW, sealing arrival of bathtubs and shower trays, Heated towel rack mounting and installation, Faucet, valve assembly, Battery connection, Removal of steel tubes cold water, Replacing the toilet fittings, Setting up microphones for video surveillance systems, Sound detector assembly, DVR installed and configured, Water meter installation, Laundry and dishwashing establishing and connecting, Boiler Installation, Shower mixer assembly, Bathroom Installation, Installation of Riser, Installation of Riser, The insulation of pipes, polypropylene laying pipes for water supply, Pipe exchange, Hose replacement, Toilet Installation, Installation of Stairs, molds, Concrete, Bathroom or Toilet Renovation, Kitchen Renovation, Bungalow Works, Precast Works, Water Meter Units, Gas meter installation, Greenhouse Construction, Office works, Balcony renovating, Complete Home, Works Swimming Pool, Garage, The replacement of the gas pipe, natural gas pipes laid underground, Handrails and Platform Construction, Installation of fire extinguishing pumps, Configure Automatic face recognition module, Tent Making, Installation of fire extinguishing pipe (150-250mm), Installation of fire extinguishing pipe (40-100mm), Installation of Sprinkler fire extinguishing system, Hydraulic testing of the fire extinguishing system, Apartment or Room Renovation, Fire extinguishing systems of pneumatic test, Extinguishing control unit mount, Fire extinguishing tank assembly, Fire extinguishing pressure gauge assembly, Concealed sprinkler fire extinguishing installations, Installation of outdoor water sprinklers, Natural gas installation, Baths and Saunas Works, Road construction, Container, Stair parts and accessories, Login, Scaffolding parts and accessories, Piers, works fine, Mold parts and accessories, Lifting and Handling, Locks and fittings, Gas Water Heaters, warm Floor, alarms, Electronic switches, cameras, Telephone systems, Sliding door, Access control systems, Additional equipment and accessories, Plastic, Paneling made, To install the shower, 6 bar pressure testing of heating systems, Installation of floor heating controller, Air Conditioning establishment between 7000 and 12000 BTU, Air Conditioning establishment between 15,000 and 18,000 BTU, 30000 BTU air conditioner establishment and above, The dismantling of the air conditioning Tamer, The establishment of a central air conditioning system, Connecting the underfloor heating temperature sensor, Turnkey boiler piping max 40 kW, Ventilation unit for wall mounting, Washing of the heating system, Condensing boiler installation, Single-circuit gas-fired boiler wall mounting, Solid fuel boiler installation of 55 kW max, The boiler installation, Flame detector assembly, Bar pressurized system test 6 bar, Installation of air conditioning units for ceiling, Installing air conditioning visor, Boiler copper pipes, Installation of the pump group, installation of wall insulation and expansion joints, Approximately 300 liters of a boiler installation, Thermostat Installation, the establishment of a thermostat, Heating installation was monifol, Shan Bacau Installation, Pump installation, Electric boiler installation, Installation of the throttle, According to the pipe-laying project for underfloor heating, insulation slab, Installation of the floor heating unit, Installation of wooden doors, be put in place and to make the door leaf, Type wooden cupboards done, Quilting coating of, Steel door installation, Making wood flooring on existing staff, Kadronl made of wood flooring, be put in place and made the handrail stairs, Roofing done, Placing plinth made of wood and instead, Placing instead of making the door frame and sill, Laminated parquet flooring made of, Electric door lock assembly, The change in the glass door, The door frame assembly, laying electric underfloor heating, After 28 days after the start of heating in concrete, Scissor structures, Shower sets, Bungolovlar, Installing window unit, Door Installation, cutting and inserting according to which it attached Plexica, Made with glass balcony systems, Cutting according to which the glass is fitted and install, Cutting according to which the glass is fitted and install, Installation of the hinge, Installation of locks, Installing glass unit, Siphon assembly, Turnstile installation, Cleaning the filter water injector, Submersible pump assembly (well), Hydraulic assembly akülmülatör max 300, Installation of new water disinfectants, supply and drainage and protection sheet instead of laying, By providing a gravel drainage done, By providing a sand drain made, Instead of laying supply and drain pipes, Adjusting the water treatment control valve, Chemical analysis of water, Brick pipe grooving, Electrical outlets replacement, disassembly and assembly, Improved connectivity scheme, Built-in fan mounting, Establishment Air Conditioning, Removing the Bath, Concrete pipes grooving, Installation of pump stations, Cold room panels made of, Filters control unit repair, Establishment of a complex water treatment system, Drilling and installation of brick box, Installation and connection of the heating towel hangers, Camera setup, Ring button setup, Glanded circulation pump assembly, Washing the ion exchange resin, Cleaning the brine tank, cleaning and repair of the seawater filter tank, establishing amplifier, 'Removing the air conditioner''s indoor unit', installation and connection of the network access controller, The surface-mounted electromechanical mortise lock, Your camera installation, The video camera setup, Removing the air conditioner outdoor unit, Light detector assembly, Street noise detector assembly, The surface-mounted electromechanical lock, Prefabricated Buildings, Smoke detector installation, Fire detector assembly, power supply installation of fire alarm, Barrier Installation, cable routing, Submersible pump assembly (General), Video surveillance server establishment and construction, Dual-circuit gas boiler wall mounting, Installation of the door control sensor, Installing the Wireless security sensors, cable laying, The control panel installation for signaling, wiring for Internet, Installation of the magnetic card reader, Establishing Router, We pin for insertion and satellite tv, establishing satellite or terrestrial antenna, Cable sensor and alarm siren installation, Container Construction, Drain pump installation, Installation of plastic sewer fittings, Installation of plastic sewer fittings, Epoxy flooring, Epoxy floor paint, Gypsum spot lights, Plaster moldings (TV unit, etc.)., Automation Services, Flooring, suede effect, efekt chain, Marble-looking effects, Wall wood veneer, Ceiling wood veneer, Decorative wood panels, Plasterboard application plinth, Wall decorative beams, Installation of Wall paneer, Lamps, sockets, the removal of links, remove the power cord, Ground Installation, Wall drilling up to 25 mm (concrete, brick), Installation of the sensors, Installation and connection of the voltage stabilizer, dusting of concrete floors, Installation and connection of the transformer, Drywall insulating, Electromechanical Contractor Services, Stucco molding applications, installation of corner panels, Removal of exposed electrical cable, Marble and granite restoration, Marble and granite cleaning, The ceiling painting with a spray gun, window painting, staining by water-based paint the ceiling, priming and painting the water pipe, painting with water-based wall paint, Hidden light of the niche dekarasyon, Making airless paint, Preparing walls for paint and wallpaper, Installation of the foam strip by means of ceiling paint, Ceiling wallpaper, acrylic sealing of adjacent ceiling tiles, Polyurethane painting, Made of synthetic dyes, Made of synthetic dyes, to be prepared on the surface of the painting process, Preparation ceiling paint and wallpaper, Wall lamp assembly (sconces), Wall or ceiling of a place in güçlenderil, Wall decorations, cornices and so on. mounting, Gypsum columns, Granite grinding and polishing, The image quality is difficult painting, painting on the wall, 3d, people, animals and so on., Charts, articles, ornaments and, Plasterboard from sealing, Painting, painting template, Marble grinding and polishing, the single layer gypsum board with mineral fiber insulation, Regulation of the drywall ceiling lighting in niches, Drywall circumference of the box applications, staining of the wood surface, Plasterboard painting, Each breed of polished wood parquet, 1 1 living room of the home replacement power cord, 3 room, 1 living room of the home replacement power cord, Strip assembly, Fitting the door stopper, supplements for Saban, waterproofing membrane assembly for SAP, American plaster, Liquid wallpaper paste, installation of sound-proof tape on Profile, Sound absorbing ceilings or walls, Wall wallpaper paste, Ceiling wallpaper paste, Fabric wallpaper paste, Vinyl wallpaper paste, Floor screed, Photo wallpaper paste, glass wallpaper paste to the wall, Glass ceiling wallpaper paste, Arrangement of PVC ceiling corners, plywood interior ceiling, Tension ceilings, Glued carpet tiles, Mounting the adapter plate, laminate flooring, MDF plinth mounting, Tongued and grooved wood floor installation of, Parker cleaning and varnishing, Silk wallpaper paste, Straw wallpaper paste, ceiling bar with wood trim, Installation of plastic plinth, Wood mounting, Laminate hardwood flooring, Ceiling lights connection and installation, Fitting the connection box until plasterboard, Fitting the connection box to the concrete, Installation of the power switch, Installation of the machine, Electricity meter connection, Installation of the junction box and cabling, Electrical panel mounting, Installing the connection box brick, drilling depth of 2 cm for wiring in concrete, Chandelier assembly, Sports light installation (transformer), Installation of the soil landscape lights, 4 1 living room of the home replacement power cord, Brick drilling depth for wiring 2cm, 2 rooms, 1 living room of the home replacement power cord, Cable inlet open fixing cables, Attaching the concrete drilling and box, floor insulation on the handle, plywood floors, filling the container with self-leveling mortars ground, Polystyrene concrete screed, Two coats of primer application, Floor sanding screed, fixing a corrugated tube with wire, Self-leveling device usage, Venetian plaster, Concrete plaster effect, Plaster Travertine, installation of electrical outlets and switches, drilling and installing the drywall box, 5 cm cement + sand screed, Parker brushing, Transparent protective done, Epoxy paints made, The fill Gypsum, Making Coping, Making Coping, Replacing latch, Replacing the hinge plastic coated, Replacing the hinge Height, Replacing the Fitted interior door locks, Replacing the roller Flush interior door lock, Replacing the door handles and mirrors, Replacing the rubber bumper head, Replacing the hinge, Replacing the springy locking catch, Instead of mounting the outer door lock cylinder shaven, Replacing Stop, Replacing the slide, Sliding wing handle instead of fitting, Replacing the transom assembly, Dose 225 Reinforced Cement Lime Mortar Making, Lime Crushed Stone in Wall Grout Grout the Making, Laying with geometric shaped Stonework, Whitewash and oil paint scraper, Plaster scraper made of, Fields made the cut concrete joints, Making the Rough Blasting Painting, Bond Fill Hydraulic Lime Mortar, Opening the joints in the wall or you move the Marble, Driving impregnated wood manufacturing done 3 times, Making plaster to interior and exterior surfaces, Soil drainage is done, Soil drainage is done, Replacing instead of the spring hinge, Making Oil Paint Scraper, A single coat plaster made, Coarse and fine plaster ceiling plaster mortar made of, Facade rough and fine plastering mortar, faucets, Facade Materials, towel warmer, Hand dryers, Piping, Water Treatment Systems, Water purification systems, Toilet bowls, urinals and bidets, pumps, Plumbing Supplies, Sinks and Bowls, Prekast, Sidewalk, Connectors, Reinforced Concrete Products, Installation of drywall, Pools, showers, Spreading made of plaster, Coarse and fine mortar made of plaster interior wall plaster, lining the walls and ceiling plaster work, Dose leveling layer made of cement, Covering over dilatation joints made of, plaster niches for radiators, saunas, applying paste, plastering the walls of the machine, The coated hand-curved surface, Made of cement screed dose, The plastered ceilings machines, making two coats of paint to iron surfaces against corrosion, Of plasterboard ceiling assembly, The decor plasterboard elements (niches, belts, etc.)., Instead Kona chamfered jambs and the Making Work, Expansion joint, laying porcelain sandstone 15mm Kalig, Saban lining, 200 mM tile assembly frieze, Inspection door manufacturing and installation, Mounting of a decorative tiled corner, Mosaic wall coverings, 100 mM ceramic frieze assembly, Mosaic tile coatings, Installation of decorative panels of ceramic tiles, Tiles slope and window sills, laying marble or granite, flooring tiles, laying tiles clinker, Decorative stone pavement, the step of laying of the tiles (radius), Installation of the mold with a polyurethane paint and putty, Textured exterior coating of water-based, The lacquered with varnished wood preservative, varnishing wood surfaces, protection of wood surfaces with colored wood preservative, Cornices made and put in place labor, Making water-based paint, Preparation of plaster or stucco (interior), Oil paint made, Walls, the lining of the roof (1 layer), Cut (not rectified) laying the tiles, STEP laying of the tiles (Flat), Crushed stone wall for a hole to be Discredited, Minaret from another Everywhere You Move Refutation, The blasted done, Made protective coat, Machine made plaster ceilings with plaster, Floor coverings made of, Concrete road construction in the cylinder cycles have Sıkıştrıl, Making Cure, Making the joint relief stone wall surface, Mosaics made of parapets, Epoxy based flooring made, Metal door frame behind concrete mortar application, 500 Dose Hydraulic Lime Mortar Bond Making, Lime Mortar Making, Curved drywall installation, recessed joints made of corrugated surface of the stone wall, Drywall partition, Machine made with alum, Made with satin plaster coating, to be ready to manufacture stone rubble, Ceramic flooring tiles 120 cm, Belt made, Sticking window and door jambs made of, Karger construction done, Made of rough plaster, Tile mortar (Epoxy), Wall coverings made of, Wallboard Making, adhering to the walls of Gypsum brick, Impregnating wood with the dipping method, Satin plaster coating made of, Grouting tiles, laying sewer pipes 100-200 mm plastic outer, Installation of the foam strips to the ceiling unpainted surfaces, Styrofoam painting, Curing application, Corundum aggregate surface hardened. application and curing, construction of a cure for new concrete surface, external thermal insulation of external walls, thermal insulation made in horizontal, paving, Polyurethane injection, Asphalt cutting, Reinforced concrete cutting, wall cutting, Brick cutting, cut for plumbing, Core bits with cutting, Concrete crushing, Heat and sound insulation made of sandwich system, Concrete cracking, Laminate coated wall protection strip made, Making parapet, Parapet done, Making jambs, Cladding made, Tile grout lining, Mounting of roof battens, laying pavement for the road, heat insulation of roofs and floors made, heat insulation of roofs and floors made, done with waterproofing geomembrane, Diamond angle, Joint cutting, leveling with graders, The walls, chimneys, etc. places waterproofing construction, Thermal insulation made of plastered application, waterproofing done in dilatation, withdrawal of pipes, Placing the metal mold for landscape, Lean Concrete Application, compression Compactor, 5cm thick coarse aggregate ser, making soil improvement, filling of joints, Paver flooring applications sandy, laying groove move andesite, soft and hard questionable with excavating machine, soft and hard questionable with excavating machine, With mire and slime excavating machine (deep cuts), Machine mire and clay excavation (free excavation), By providing sand, paving machines, Mesh concrete, Instead of laying curbs, Cover Installation, Two coats of waterproofing done, Basement walls made of thermal insulation, Laying of geotextile, Making Waterproofing, 150 g / m² weight laying geotextile, Gutter paving laying, Single layer waterproofing done, Installation of roof ventilation, Mounting of roof insulation, Paver flooring, parquet flooring in stone ramp, Gutter channels made from stone, Removal of pavement BORDUUR, Installation of roof windows, fully coated wood shoring excavations done, Tile cutting and edge grinding, Installation of laying tile corner, EPS insulated panel wall construction of ankrajlanarak, wall construction with stone Nevsehir, Handmade classic brick used in flooring, Flooring made of craftsmanship, Cinder block wall, make balustrades, repair of membrane damage, antiseptic applications, Installation of front roof overhang, Installation of rainwater pipe or conduit, applying roof waterproofing paste, cleaning of leakage, PVC membrane assembly, Installation of Lightning Rod, laying plastic outer sewer pipes 200-400 mm, laying sewer pipes plastic outer, Septik tank menhol montajı, Turnkey installation of a plastic septic tanks, formwork made from steel pipe, partition walls made gypsum boards, series molds made of wood, Roofing and cladding made of, Making the roof gutters, Making Mahy, Making roofing, Crane made using the roof carrier, The antenna and pole mount, Mold made of concrete and reinforced concrete, rough wall, Single-framed exterior walls made of, bearing floors made using cranes, Gravel road, asphalt manual, Old asphalt road debris up to 15 cm +, Gravel road, rail mining, Gravel road, rail mining, Crushed stone paths, concrete, reinforcement, concrete pavement gravel road up to 15 cm +, concrete pavement gravel road up to 30 cm +, Rubble road asphalt coating machine +, path planning and crushed stone fill up to 15 cm, Making Sills, 45 degrees and the edges of washed grinding, hole in the floor for a socket or pipe, Tile grout (Standard), laying the tiles on the walls, Ceramic floor coverings, Covering Making Stair Step, Up to 30 cm old asphalt gravel road +, Armored bimsbeto supply and the installation location of the lintel, with walls made of aerated concrete wall blocks, walls made of blocks with the carrier bimsbeto, walls are constructed with limestone sand, Making the wall using cranes, do Stairs, Concrete cutting to thin rope, Floor coverings made of, Floor Covering Making, Path along the trough floor (labor), 3-meter curb-laying during road construction, laying a meter during road construction curbs, Installation of ceiling moldings, frequent excavations made wooden shoring, Excavations intermittently coated wood shoring done, Conventional Curtain And Column Manufacturing, Raft Foundation Manufacturing, Basic mold manufacturing, Well Foundation, manual routing of soil removed from the excavation, with hard rock excavating machine (deep cuts), With soft rock excavation machines (deep cuts), with hard rock excavating machinery (free excavation), With soft rock excavating machine (free excavation), soft and hard earth excavating machines, soft and hard earth excavating machines, Need not be eliminated Laying the Fine Aggregate, filling works for basic, excavation work done in the old ruins of rubble, The original excavation of soft body walls, The original size of the excavation house boundary walls, Roof made lighthouse bottoms and to put in place, Rainwater reservoir made and the fixing of, It is covered with sandstone walls, Front compliance testing done, Coating installation of, Gear Flooring (Ribbed Floor), plaster machine, very hard rock excavating machines (free excavation), Retaining Curtain Manufacturing, Pile Foundation Manufacturing, filling of the foundation pit, dig a pit for basic, Placing of roof gutters and instead made, Cork flooring is made, Beamed Flooring, Asmolen Flooring, 3 parquet floor polishing for filling cracks, The welding seams of linoleum, Painting, Floorboards installation, OSB or plywood cutting machine on the ground, Staining of the floorboard, Vinyl tile installation, Varnishing and sanding wooden floors, Plywood sanding, plywood sanding with the help of putty on the ground, Installation of Aluminum baseboards, Marble small stones (chips), Texturing gypsum based plaster, Glueless laying carpet, Establishment of drainage systems, laying the laminate transversely, Plywood or OSB flooring, Concrete preparing mortar, Column And Curtain Construction Works, Foundation Drainage, Foundation Insulation, Iron Reinforcement For Foundation Concrete, Soil Leveling And Grobeton Casting, Floor dust and to clean up the spill, 'Excavation ''s Getting', Electrical Grounding, Installation of underwater lights, Decorative plaster tiles, Ceramic Installation of baseboards, woodblock, Polyurethane skirting installation, Water System Installation, And conducting the fixing of the gutter, be put in place and making the window sill, Home Testing and Commissioning Works, Chemical Cleaning Services, Home Mechanical Assembly Services, OHL Erection, the laying of cobblestones Sidewalk, Concrete Structures Construction Services, Underground Drainage Services, Underground Piping & Cabling Services, Services Building Basics, Earthworks, Drejing Services, Structural Steel Erection Services, Siding Works, Transformer Installation Works, Services Architecture and Fine Works, Paving Services, By providing gravel, paving machines, paving the machine, irrigation and compression done, make Leveling, of cleaning after the excavation, To fill the ditch and Čukarica, Machine excavation, Onsite Pipe Manufacturing and Assembly, filling made with lightweight aggregates, laying Mesh, Curb laying, MV & LV Panel Installation Works, MV & HV Cable Assembly, Erection of switchgear Course, Home Electrical Works, Fire Fighting System Installation Service, HVAC Installation Service, Heavy Lifting & Handling Equipment, installation of reinforcement mesh for facade, the lining of the front surface, ready-mixed concrete plant in the loss generated, Ribbed steel bars Ø 28 mm greater application, 8- Ø Ø 12 mm ribbed concrete steel bar application, Installation of anchors, 14- Ø Ø 28 mm ribbed concrete steel bar application, the replacement of ribbed steel mesh, Installation of anti-sealing apparatus, Mounting grooves facade, Instead of mounting the gutter and made, Drainpipes made and the fixing of, facade insulation assembly, Coating done and to put in place, Granite plaster, plastering the front edge, Mechanical Insulation Service, Mechanical Equipment Installation Service, Cooling Tower / ACC Installation Service, Chimney Installation Service, Turbine-Generator Installation, Pipe Installation, Facade decorative plasters, Steam Boiler / HRSG Installation, 'Floor tiles ''pork''', excavation machines using explosives, with very hard rock excavating machine (deep cuts), Installation of the connection apare, scaffold, Siding, Fields Production Tank Installation Service, Heat Soundproofing, serve in the categories.

Profession

Company Info

  • Occupation / Category Mechanical & Electrical
  • Approved Documents

    Email

Find Subcontractors and Employees on Workindo!

Aslat İnşaat Mek. Elekt. San. Ve Tic. Ltd. Şti. is registered on Workindo. You may also find the right subcontractors or be a subcontractor by registering to our platform. Workindo also lets you search for potential employees and create a team for your next project.
Register Now baret ikon