Profile Picture

Demir Yapı

room

Description

Her türlü inşaat taahhüt ve tasarım işlerini yapmaktayız

 

Demir Yapı, Turkey at your location and Replacing latch, Replacing the rubber bumper head, Replacing the door handles and mirrors, Replacing the roller Flush interior door lock, Replacing the hinge plastic coated, Replacing the hinge Height, Replacing the hinge, Replacing the Fitted interior door locks, Instead of mounting the outer door lock cylinder shaven, lining the walls and ceiling plaster work, Replacing the slide, Sliding wing handle instead of fitting, Replacing the transom assembly, Replacing instead of the spring hinge, Replacing the springy locking catch, Driving impregnated wood manufacturing done 3 times, The fill Gypsum, The coated hand-curved surface, Replacing Stop, Impregnating wood with the dipping method, Textured exterior coating of water-based, Plasterboard from sealing, Wall decorations, cornices and so on. mounting, staining of the wood surface, Plasterboard painting, The ceiling painting with a spray gun, acrylic sealing of adjacent ceiling tiles, Installation of the mold with a polyurethane paint and putty, Polyurethane painting, Making water-based paint, Made of synthetic dyes, Made of synthetic dyes, protection of wood surfaces with colored wood preservative, varnishing wood surfaces, The lacquered with varnished wood preservative, Preparation of plaster or stucco (interior), plastering the walls of the machine, Epoxy paints made, making two coats of paint to iron surfaces against corrosion, Transparent protective done, Each breed of polished wood parquet, to be prepared on the surface of the painting process, Oil paint made, The plastered ceilings machines, Facade rough and fine plastering mortar, plaster niches for radiators, Made with satin plaster coating, Satin plaster coating made of, Machine made plaster ceilings with plaster, 500 Dose Hydraulic Lime Mortar Bond Making, Dose 225 Reinforced Cement Lime Mortar Making, Lime Mortar Making, Bond Fill Hydraulic Lime Mortar, Plaster scraper made of, Making the Rough Blasting Painting, Making Oil Paint Scraper, Whitewash and oil paint scraper, Opening the joints in the wall or you move the Marble, Laying with geometric shaped Stonework, Lime Crushed Stone in Wall Grout Grout the Making, Installation of drywall, Of plasterboard ceiling assembly, Drywall partition, The decor plasterboard elements (niches, belts, etc.)., Curved drywall installation, Drywall circumference of the box applications, Made of rough plaster, applying paste, Machine made with alum, Made protective coat, Covering over dilatation joints made of, Made of cement screed dose, Dose leveling layer made of cement, Coarse and fine mortar made of plaster interior wall plaster, Spreading made of plaster, Wall or ceiling of a place in güçlenderil, Coarse and fine plaster ceiling plaster mortar made of, A single coat plaster made, Fields made the cut concrete joints, Soil drainage is done, Soil drainage is done, Making Coping, Making Coping, Making plaster to interior and exterior surfaces, Metal door frame behind concrete mortar application, Mosaics made of parapets, recessed joints made of corrugated surface of the stone wall, Making the joint relief stone wall surface, Making Cure, Concrete road construction in the cylinder cycles have Sıkıştrıl, Floor coverings made of, Epoxy based flooring made, Making airless paint, Preparation ceiling paint and wallpaper, Installation of the foam strip by means of ceiling paint, Up to 30 cm old asphalt gravel road +, laying a meter during road construction curbs, 3-meter curb-laying during road construction, Path along the trough floor (labor), Covering Making Stair Step, Making parapet, Parapet done, Making Sills, Cladding made, Making jambs, Laminate coated wall protection strip made, Tile grout lining, Tile cutting and edge grinding, Installation of laying tile corner, Ceramic floor coverings, concrete pavement gravel road up to 30 cm +, Rubble road asphalt coating machine +, Gravel road, asphalt manual, The walls, chimneys, etc. places waterproofing construction, Work at High Altitude, glass cleaning team, Strut assembly, Blinds Installation, Roof cleaning winter, Curing application, Corundum aggregate surface hardened. application and curing, construction of a cure for new concrete surface, laying pavement for the road, paving, leveling with graders, path planning and crushed stone fill up to 15 cm, concrete pavement gravel road up to 15 cm +, Crushed stone paths, concrete, reinforcement, Gravel road, rail mining, Gravel road, rail mining, Old asphalt road debris up to 15 cm +, laying the tiles on the walls, Tile grout (Standard), hole in the floor for a socket or pipe, 45 degrees and the edges of washed grinding, Karger construction done, Sticking window and door jambs made of, Wall coverings made of, Wallboard Making, Belt made, to be ready to manufacture stone rubble, The blasted done, Minaret from another Everywhere You Move Refutation, Crushed stone wall for a hole to be Discredited, Cornices made and put in place labor, Instead Kona chamfered jambs and the Making Work, Saban lining, Walls, the lining of the roof (1 layer), Ceiling wallpaper, Regulation of the drywall ceiling lighting in niches, painting with water-based wall paint, Preparing walls for paint and wallpaper, Hidden light of the niche dekarasyon, priming and painting the water pipe, staining by water-based paint the ceiling, window painting, Grouting tiles, Expansion joint, 'Floor tiles ''pork''', Decorative plaster tiles, adhering to the walls of Gypsum brick, Ceramic Installation of baseboards, Inspection door manufacturing and installation, 100 mM ceramic frieze assembly, Mosaic tile coatings, Mounting of a decorative tiled corner, Mosaic wall coverings, Installation of decorative panels of ceramic tiles, Tiles slope and window sills, 200 mM tile assembly frieze, flooring tiles, laying tiles clinker, Decorative stone pavement, the step of laying of the tiles (radius), STEP laying of the tiles (Flat), Cut (not rectified) laying the tiles, laying marble or granite, laying porcelain sandstone 15mm Kalig, Ceramic flooring tiles 120 cm, Tile mortar (Epoxy), the single layer gypsum board with mineral fiber insulation, Liquid wallpaper paste, installation of sound-proof tape on Profile, Installation of the sensors, Wall drilling up to 25 mm (concrete, brick), remove the power cord, Removal of exposed electrical cable, Ground Installation, Lamps, sockets, the removal of links, Plant apartment to move, 1 1 living room of the home replacement power cord, 2 rooms, 1 living room of the home replacement power cord, Installation and connection of the voltage stabilizer, 3 room, 1 living room of the home replacement power cord, Installation of the soil landscape lights, Installation of Floor luminaires, Installation of underwater lights, Projector installation and connection, Installation of LED lamps, Improved connectivity scheme, Built-in fan mounting, Establishment Air Conditioning, Ring button setup, 4 1 living room of the home replacement power cord, Installation and connection of the transformer, Sports light installation (transformer), Wall lamp assembly (sconces), dusting of concrete floors, Epoxy floor paint, drilling depth of 2 cm for wiring in concrete, Brick drilling depth for wiring 2cm, Electrical panel mounting, Electricity meter connection, Installation of the machine, Installation of the power switch, Fitting the connection box to the concrete, Installing the connection box brick, Fitting the connection box until plasterboard, Installation of the junction box and cabling, Cable inlet open fixing cables, fixing a corrugated tube with wire, Attaching the concrete drilling and box, drilling and installing the drywall box, installation of electrical outlets and switches, Ceiling lights connection and installation, Chandelier assembly, Camera setup, Installation and connection of the heating towel hangers, Electrical outlets replacement, disassembly and assembly, Drilling and installation of brick box, Removing the Sink, Removing the Sink, Pipe exchange, Hose replacement, polypropylene laying pipes for water supply, Replacing the toilet fittings, laying copper pipes for water supply, The insulation of pipes, Bathroom Installation, Toilet Installation, Shower mixer assembly, Boiler Installation, Laundry and dishwashing establishing and connecting, Siphon assembly, Installing Kitchen doğrayıcıs, Sanitary shower installation, Collector installation, Collector installation, Installation of Riser, Installation of Riser, Water meter installation, To install the shower, Installation of Stairs, Faucet, valve assembly, Removal of steel tubes cold water, Removing the sewer, Brick pipe grooving, Glanded circulation pump assembly, Cold room panels made of, Installation of pump stations, Establishment of a complex water treatment system, Chemical analysis of water, Installation of new water disinfectants, Adjusting the water treatment control valve, cleaning and repair of the seawater filter tank, Cleaning the brine tank, Washing the ion exchange resin, Filters control unit repair, supply and drainage and protection sheet instead of laying, By providing a gravel drainage done, By providing a sand drain made, Instead of laying supply and drain pipes, Concrete pipes grooving, Removing the Bath, Drywall insulating, Marble and granite restoration, Granite grinding and polishing, Laminate hardwood flooring, Wood mounting, Installation of plastic plinth, Mounting the adapter plate, Strip assembly, Fitting the door stopper, Parker cleaning and varnishing, Tongued and grooved wood floor installation of, MDF plinth mounting, plywood floors, Parker brushing, Polyurethane skirting installation, Plywood or OSB flooring, Floor dust and to clean up the spill, laying the laminate transversely, Vinyl tile installation, 3 parquet floor polishing for filling cracks, The welding seams of linoleum, Painting, Floorboards installation, woodblock, filling the container with self-leveling mortars ground, Polystyrene concrete screed, Sound absorbing ceilings or walls, Wall wallpaper paste, Ceiling wallpaper paste, Fabric wallpaper paste, waterproofing done in dilatation, Vinyl wallpaper paste, Photo wallpaper paste, glass wallpaper paste to the wall, Glass ceiling wallpaper paste, Straw wallpaper paste, Silk wallpaper paste, Floor screed, waterproofing membrane assembly for SAP, floor insulation on the handle, supplements for Saban, 5 cm cement + sand screed, Self-leveling device usage, Floor sanding screed, Two coats of primer application, OSB or plywood cutting machine on the ground, Staining of the floorboard, Varnishing and sanding wooden floors, Glueless laying carpet, Wall wood veneer, Ceiling wood veneer, Flooring, Decorative wood panels, Wall decorative beams, Installation of Wall paneer, installation of corner panels, Stucco molding applications, Plasterboard application plinth, Plaster moldings (TV unit, etc.)., Gypsum columns, Gypsum spot lights, Painting, painting template, Charts, articles, ornaments and, painting on the wall, 3d, people, animals and so on., The image quality is difficult painting, Marble grinding and polishing, Marble and granite cleaning, Marble-looking effects, suede effect, Plywood sanding, plywood sanding with the help of putty on the ground, Installation of Aluminum baseboards, laminate flooring, Glued carpet tiles, Tension ceilings, plywood interior ceiling, ceiling bar with wood trim, Arrangement of PVC ceiling corners, Installation of the foam strips to the ceiling unpainted surfaces, Installation of ceiling moldings, Styrofoam painting, Texturing gypsum based plaster, Marble small stones (chips), American plaster, Venetian plaster, Concrete plaster effect, Plaster Travertine, efekt chain, Single layer waterproofing done, Thermal insulation made of plastered application, Basement walls made of thermal insulation, Removing the timber liner, Removing Panels, removing the screed 10 cm, Removing linoleum adhesive, Removing the old parquet, Removing the skirting board, Removing the hardwood floors, Removing the laminate, plaster removal, demolition of brick or gypsum partition, removing the wall made of plasterboard, demolition of buildings or structures, demolition of buildings or structures, removal of the steel structure, Removing paint from Radyöter, Removing oil paint from a window sill, Removing Brick, remove the wallpaper, Removal of tiles, Turnkey knit fence from bricks, wrought iron fence key delivery, Fence foundation, Pouring concrete fence, Installation of concrete fencing, concrete repair mortar for concrete repairs with Surface, Crack Repair With Epoxy Injection, Mortar or mud Horosan Karger Demolition, Removing wood frame, Wood Roof Removal, Removing slatted wooden flooring, Removing the Toilet, To remove the Bathroom, Removing the battery, Removal of paint from surfaces, Removing the paint from the tube, remove the whitewash from the ceiling,, remove paint from the ceiling, Paint and Equipment, Binding materials, Forest Products, Geosentetik, Glass, Karbon Fiber, Consumables, Connectors, Covering, Facade Materials, Curb laying, the laying of cobblestones Sidewalk, laying Mesh, Mesh concrete, making soil improvement, 5cm thick coarse aggregate ser, compression Compactor, Placing the metal mold for landscape, Iron and Steel, Automation installation (roll), Heat Soundproofing, piles, remove paint from the wall, Regional cleanliness, general cleaning, Parker cleaning, cleaning of plumbing fixtures, Washing of the ladder, cleaning metal shutters, heating and cleaning of the radiator, The cleanliness of the Lamp, Installing and unlocking, Installation of home appliances, Reinforced Concrete Products, Prekast, Sidewalk, Roofing and waterproofing, withdrawal of pipes, Garage door installation, Installation of automation for hinged doors, Cast in place concrete piling made, Cast in-situ concrete diaphragm walls are constructed, Aluminum construction for greenhouses, Galvanized Construction for greenhouses, Jet grouting is done Manufacture, Applications jobs, False ceilings, Coatings made, Coatings made, Coatings made, Stair railings made of, Stair railings and handrails made of, supply and the fixing of the PVC corner profile, Plinth supply and instead of detecting, Instead of mounting pvc transition profile., Installation of flexible PVC based plinth, Manufacture of plastic joinery done and instead position, Horizontal directional drilling, Construction Management Services, Facade-Exterior Face Consultancy, Landscape Consultancy, Acoustic Consultancy, Pre-Construction Leasing Consultancy, Study Pre-Contract Bidding Documents, Contract Negotiations, Contract agents and interpret prosedürer, Determination of Risks, determination and strategy consulting contract, Determination of procedures and contract management, Contract management, Cost control and Management, Planning and preparation work calendar, Claims and change management, Claims analysis and defense, recovery of troubled projects, Engineering education, be put in place and making Iron works, and the replacement of windows and doors made, Fonts from grill, cover, garguy done, applications, Aluminum joinery manufacturing and assembly done, the replacement windows done and, Installing window unit, cutting and inserting according to which it attached Plexica, Installing glass unit, Made with glass balcony systems, Cutting according to which the glass is fitted and install, Cutting according to which the glass is fitted and install, Installation of the hinge, Installation of locks, Installation of wooden doors, The change in the glass door, Door Installation, Steel door installation, The door frame assembly, Installation of sliding door, Installation of swing door, Installation of sectional garage and industrial doors, to be made and instead the Greenhouse, Installation of automation for sliding doors, be put in place and to make the door leaf, Kadronl wall and ceiling coverings made of wood, Welding made railing, be put in place, supply and the replacement manhole, Lay-system false ceilings, Seated system false ceilings, Hidden carrier systems false ceilings, supply and the fixing of profile flooding, bending the sheet metal door frame construction and installation in place, Paneling made, Roof made, Placing instead of making the door frame and sill, Placing plinth made of wood and instead, Parker coating of, Roofing done, be put in place and made the handrail stairs, Kadronl made of wood flooring, Laminated parquet flooring made of, Type wooden kitchen countertops made of six cabinet, Type wooden kitchen countertop cabinet made, Making carcass structure, Type wooden cupboards done, Frame Building on Wall Covering Making, Making Wood Masonry Wall, Paver flooring applications sandy, filling of joints, Gutter paving laying, Making the wall using cranes, Single-framed exterior walls made of, partition walls made gypsum boards, EPS insulated panel wall construction of ankrajlanarak, wall construction with stone Nevsehir, Handmade classic brick used in flooring, Flooring made of craftsmanship, Mold made of concrete and reinforced concrete, bearing floors made using cranes, series molds made of wood, Facade scaffold made, flat faced concrete formwork made with Plywood, Making concrete with mold tunnel mold system, series made with sheet formwork, placing timber on the pier suspension, Carcass Making Work, Domes and vaults scaffold made of craftsmanship, Global Surface Karger Building Mold Making, formwork made from steel pipe, Armored bimsbeto supply and the installation location of the lintel, with walls made of aerated concrete wall blocks, Wall made, Wall made, Wall made, Mounting of roof battens, antiseptic applications, Installation of front roof overhang, Installation of rainwater pipe or conduit, applying roof waterproofing paste, cleaning of leakage, PVC membrane assembly, repair of membrane damage, Installation of Lightning Rod, The antenna and pole mount, Crane made using the roof carrier, Making roofing, Making Mahy, Making the roof gutters, Roofing and cladding made of, rough wall, Cinder block wall, walls are constructed with limestone sand, walls made of blocks with the carrier bimsbeto, All kinds of profiles, made of steel frame construction, All kinds of profiles, made of steel frame construction, Preparation of all kinds of iron profile, Preparation of all kinds of iron profile, Roof truss made and put in place., Steel arch / vault made, Steel arch / vault made, Reinforced concrete cutting, wall cutting, Brick cutting, cut for plumbing, Core bits with cutting, Polyurethane injection, Concrete crushing, Concrete cracking, Joint cutting, Diamond angle, done with waterproofing geomembrane, heat insulation of roofs and floors made, heat insulation of roofs and floors made, Heat and sound insulation made of sandwich system, thermal insulation made in horizontal, Heated towel rack mounting and installation, external thermal insulation of external walls, 150 g / m² weight laying geotextile, Making Waterproofing, Laying of geotextile, Asphalt cutting, Installation of roof windows, Concrete cutting to thin rope, make balustrades, Construction for greenhouses, Installation of underground septic tanks, Installation of the septic tank cover, Installation of the septic tank manhole cover, laying of the sewer line, Septik tank menhol montajı, laying sewer pipes plastic outer, laying plastic outer sewer pipes 200-400 mm, Installation of plastic sewer fittings, Installation of plastic sewer fittings, laying sewer pipes 100-200 mm plastic outer, Turnkey installation of a plastic septic tanks, Drain pump installation, Carrier slab construction with concrete slab elements, Making Precast Concrete Manufacturing and assembly, stairs, stairs, Wooden stairs to, do Stairs, Installation of roof ventilation, Mounting of roof insulation, excavation machines using explosives, very hard rock excavating machines (free excavation), with very hard rock excavating machine (deep cuts), with hard rock excavating machine (deep cuts), With soft rock excavation machines (deep cuts), with hard rock excavating machinery (free excavation), With soft rock excavating machine (free excavation), manual routing of soil removed from the excavation, Need not be eliminated Laying the Fine Aggregate, excavation work done in the old ruins of rubble, The original excavation of soft body walls, The original size of the excavation house boundary walls, dig a pit for basic, filling of the foundation pit, filling works for basic, Basic mold manufacturing, Concrete preparing mortar, soft and hard earth excavating machines, soft and hard earth excavating machines, Clean and Waste Water Facilities, soft and hard questionable with excavating machine, soft and hard questionable with excavating machine, With mire and slime excavating machine (deep cuts), Cover Installation, Removal of pavement BORDUUR, Gutter channels made from stone, parquet flooring in stone ramp, Paver flooring, Instead of laying curbs, laying groove move andesite, Floor coverings made of, Floor Covering Making, Machine excavation, of cleaning after the excavation, excavation with shovel, To fill the ditch and Čukarica, make Leveling, paving the machine, irrigation and compression done, By providing gravel, paving machines, filling made with lightweight aggregates, Excavations intermittently coated wood shoring done, frequent excavations made wooden shoring, fully coated wood shoring excavations done, By providing sand, paving machines, Machine mire and clay excavation (free excavation), Two coats of waterproofing done, 'Excavation ''s Getting', Reinforcement to knit for basic concrete, Siding, scaffold, Installation of the connection apare, Installation of anchors, Installation of anti-sealing apparatus, Establishment of drainage systems, Mounting grooves facade, plaster machine, Coating installation of, Front compliance testing done, It is covered with sandstone walls, Rainwater reservoir made and the fixing of, Placing of roof gutters and instead made, Roof made lighthouse bottoms and to put in place, And conducting the fixing of the gutter, Coating done and to put in place, be put in place and making the window sill, Drainpipes made and the fixing of, Instead of mounting the gutter and made, Stove hole nozzle and valvular, Facade decorative plasters, Earthwork and Lean concrete Loss, plastering the front edge, installation of reinforcement mesh for facade, Basic Insulation, Column and Slab Curtain Works, Cork flooring is made, Gear Flooring (Ribbed Floor), the replacement of ribbed steel mesh, 14- Ø Ø 28 mm ribbed concrete steel bar application, Ribbed steel bars Ø 28 mm greater application, 8- Ø Ø 12 mm ribbed concrete steel bar application, ready-mixed concrete plant in the loss generated, the lining of the front surface, facade insulation assembly, Granite plaster, sealing arrival of bathtubs and shower trays, serve in the categories.

Profession

Company Info

  • Occupation / Category Mechanical & Electrical
  • Approved Documents

    Phone Number

Find Subcontractors and Employees on Workindo!

Demir Yapı is registered on Workindo. You may also find the right subcontractors or be a subcontractor by registering to our platform. Workindo also lets you search for potential employees and create a team for your next project.
Register Now baret ikon