Profile Picture

Eb Yapi Mimarlik

room

Description

20 yillik öz geçmişimiz ile 

Klasik dekor anlayışınızı değiştiriyoruz 

Yeni yaşam mimariniz

İsimiz guvencemiz...

Eb Yapi Mimarlik, Turkey at your location and Laying metal and plastic heating pipes, Battery connection, Heating radiator assembly, Removing the gains from the ground, Place standing gas boiler installation up to 55 kW, Faucet, valve assembly, sealing arrival of bathtubs and shower trays, Heated towel rack mounting and installation, laying heating pipes Polypropylene, Installation of Stairs, laying copper heating pipe, Dual-circuit gas boiler wall mounting, Bar pressurized system test 6 bar, To install the shower, Condensing boiler installation, Single-circuit gas-fired boiler wall mounting, Solid fuel boiler installation of 55 kW max, The boiler installation, Electric boiler installation, Pump installation, Washing of the heating system, Shan Bacau Installation, Siphon assembly, Installation of Riser, Installation of Riser, Sanitary shower installation, By providing a gravel drainage done, By providing a sand drain made, Instead of laying supply and drain pipes, Concrete pipes grooving, Removing the sewer, Brick pipe grooving, Removing the Bath, Removal of steel tubes cold water, Removing the Sink, Removing the Sink, Replacing the toilet fittings, Installing Kitchen doğrayıcıs, Hose replacement, polypropylene laying pipes for water supply, laying copper pipes for water supply, The insulation of pipes, Bathroom Installation, Toilet Installation, Shower mixer assembly, Boiler Installation, Laundry and dishwashing establishing and connecting, Water meter installation, the establishment of a thermostat, Collector installation, Collector installation, Pipe exchange, Thermostat Installation, Installation of the pump group, Approximately 300 liters of a boiler installation, Installation of Sprinkler fire extinguishing system, Fire extinguishing systems of pneumatic test, Hydraulic testing of the fire extinguishing system, Natural gas installation, natural gas pipes laid underground, Gas meter installation, The replacement of the gas pipe, Apartment or Room Renovation, Bathroom or Toilet Renovation, Installation of fire extinguishing pipe (40-100mm), Kitchen Renovation, Precast Works, Baths and Saunas Works, Fireplaces and Stoves, Greenhouse Construction, Office works, Balcony renovating, Complete Home, Works Swimming Pool, Garage, Tent Making, Handrails and Platform Construction, Bungalow Works, Installation of the throttle, Installation of fire extinguishing pipe (150-250mm), Concealed sprinkler fire extinguishing installations, Boiler copper pipes, supply and drainage and protection sheet instead of laying, Heating installation was monifol, Turnkey boiler piping max 40 kW, warm Floor, Connecting the underfloor heating temperature sensor, laying electric underfloor heating, Installation of the floor heating unit, insulation slab, installation of wall insulation and expansion joints, According to the pipe-laying project for underfloor heating, Fire extinguishing pressure gauge assembly, 6 bar pressure testing of heating systems, Installation of floor heating controller, Fire detector assembly, Smoke detector installation, Flame detector assembly, Sound detector assembly, Street noise detector assembly, power supply installation of fire alarm, Light detector assembly, Installation of outdoor water sprinklers, After 28 days after the start of heating in concrete, Filters control unit repair, Submersible pump assembly (General), Plasterboard application plinth, Plaster moldings (TV unit, etc.)., Gypsum columns, Gypsum spot lights, Painting, painting template, Charts, articles, ornaments and, painting on the wall, 3d, people, animals and so on., The image quality is difficult painting, Marble grinding and polishing, Stucco molding applications, Granite grinding and polishing, Marble and granite restoration, dusting of concrete floors, Epoxy floor paint, Electromechanical Contractor Services, drilling depth of 2 cm for wiring in concrete, Brick drilling depth for wiring 2cm, Electrical panel mounting, Electricity meter connection, Marble and granite cleaning, Installation of the machine, Installation of Wall paneer, plywood interior ceiling, ceiling bar with wood trim, Arrangement of PVC ceiling corners, Installation of the foam strips to the ceiling unpainted surfaces, Installation of ceiling moldings, Styrofoam painting, Texturing gypsum based plaster, Marble small stones (chips), American plaster, installation of corner panels, Venetian plaster, Plaster Travertine, suede effect, efekt chain, Marble-looking effects, Wall wood veneer, Ceiling wood veneer, Flooring, Decorative wood panels, Wall decorative beams, Concrete plaster effect, Installation of the power switch, Fitting the connection box to the concrete, Installing the connection box brick, Improved connectivity scheme, Built-in fan mounting, Establishment Air Conditioning, Ring button setup, Camera setup, Installation and connection of the heating towel hangers, Electrical outlets replacement, disassembly and assembly, Drilling and installation of brick box, Glanded circulation pump assembly, Installation of LED lamps, Cold room panels made of, Installation of pump stations, Establishment of a complex water treatment system, Chemical analysis of water, Installation of new water disinfectants, Adjusting the water treatment control valve, cleaning and repair of the seawater filter tank, Cleaning the brine tank, Washing the ion exchange resin, Container Construction, Cleaning the filter water injector, Submersible pump assembly (well), Projector installation and connection, Installation of underwater lights, Installation of Floor luminaires, Fitting the connection box until plasterboard, Installation of the junction box and cabling, Cable inlet open fixing cables, fixing a corrugated tube with wire, Attaching the concrete drilling and box, drilling and installing the drywall box, installation of electrical outlets and switches, Ceiling lights connection and installation, Chandelier assembly, Wall lamp assembly (sconces), Sports light installation (transformer), Installation and connection of the transformer, Installation and connection of the voltage stabilizer, Installation of the sensors, Wall drilling up to 25 mm (concrete, brick), Ground Installation, remove the power cord, Removal of exposed electrical cable, Lamps, sockets, the removal of links, Plant apartment to move, 1 1 living room of the home replacement power cord, 2 rooms, 1 living room of the home replacement power cord, 3 room, 1 living room of the home replacement power cord, 4 1 living room of the home replacement power cord, Installation of the soil landscape lights, Hydraulic assembly akülmülatör max 300, ROLEVET, Architectural project drawing, wardrobes, Chairs and Sofas, TV unit and stand, Bookshelf, Tables, Tables, Chairs, Chairs, Beds, Bases and vacuumed, Şifonyer, Wooden structures, Nightstand, Shoe cabinet, Computer and Desk, Office chairs and Chairs, Coffee Tables, Multi-purpose cabinets, Decorative shelves, Furniture accessories, Garden furniture, Garden landscaping products, Coat and matresses, Garden swings, Bungolovlar, Prestressed beams, Plastic, Additional equipment and accessories, Road construction, Lifting and Handling, Concrete, Retaining System, molds, Piers, Mold parts and accessories, Scaffolding parts and accessories, Stair parts and accessories, Container, Scissor structures, works fine, Locks and fittings, Pergolas and umbrellas, Garden storage, Evie batteries, Kitchen Accessories, Kitchen bins, Kitchen tiles, Built-in Kitchen Sets, Built-in Kitchen Sets, Small household appliances, Small household appliances, Cooker hoods and extractor hood, Kitchen hoods, Oven and hobs, Oven and hobs, refrigerators, refrigerators, Water coolers, Water coolers, Shells, Freezers, Freezers, Carpets and rugs, Blinds, curtains, Window Coverings, Ceiling and Wall Coverings, Decorative objects, Wallpapers, accessories, Dishwashers, Dishwashers, Garden lighting, Water filters and accessories, Water filters and accessories, Pots and accessories, Irrigation apparatus, Garden Saws, Garden Saws, Garden tools, Garden machinery, Bathroom cabinets, Shower Cabins, Bathroom accessories, Pantry Cabinets and shelves, Shower sets, Bathroom faucets, sinks, And Toilet Seat Covers, Bins and brushes, Faucets and spare parts, Bathroom fans, Siphones, Kitchen cabinets, Washbasin taps, Sliding door, Login, room, Sta4CAD, Idecad, Perform 3D, Office Programs, Tekla Structure, Matlab, PLM, Adobe, AMP, Blender, WHAT, SAP2000, Mechanical projects, Architectural projects, Static projects, design with BIM, Map projects, Ground projects, Earthquake test, Electricity projects, Reinforced Concrete Products, plaxis, Ms Project, Historic preservation and restoration work, Restitution, Architectural space arrangement, Manufacturing embodiment, Architectural landscaping, Urban design, Development planning studies, Conservation plans are, Architectural practices and management, Architectural consultancy, Netcad, do the research article for Space, sketching according to customer request, Quality and price do research, Create aesthetic and functional designs, Sketches, drawings and floor plans to produce, Spring, Aconex, ETABS, BIM software, Creating the research and design process, Prekast, Sidewalk, Water Meter Units, Radiators, convectors, Fan Heaters, Heat Guns, Water Heaters, boilers, Burners, Plumbing Supplies, Gas Water Heaters, Pressure and temperature controls, Heat Storage Tanks, Drywall heating, Split system, Ventilation Systems, Air conditioners, Air conditioners, Stoves and Fireplaces, pumps, Piping, piles, Roofing and waterproofing, Heat Soundproofing, Iron and Steel, Paint and Equipment, Forest Products, Binding materials, Geosentetik, Connectors, Consumables, Covering, Glass, Karbon Fiber, Facade Materials, showers, saunas, Pools, Toilet bowls, urinals and bidets, Sinks and Bowls, faucets, towel warmer, Hand dryers, Reconstruction project drawings for peace, Tension ceilings, plywood sanding with the help of putty on the ground, laminate flooring, Lime Crushed Stone in Wall Grout Grout the Making, Installation of drywall, Of plasterboard ceiling assembly, Drywall partition, The decor plasterboard elements (niches, belts, etc.)., Curved drywall installation, Drywall circumference of the box applications, Regulation of the drywall ceiling lighting in niches, the single layer gypsum board with mineral fiber insulation, Drywall insulating, Laying with geometric shaped Stonework, installation of sound-proof tape on Profile, Ground Improvement / Piling Services, Improvement ground / Piling Services, Drejing Services, Underground Drainage Services, Underground Piping & Cabling Services, Services Building Basics, Earthworks, Siding Works, Concrete Structures Construction Services, Structural Steel Erection Services, Services Architecture and Fine Works, Paving Services, Sound absorbing ceilings or walls, Topography & Mapping Services, Opening the joints in the wall or you move the Marble, Making Oil Paint Scraper, Making Coping, Making Coping, Making plaster to interior and exterior surfaces, Metal door frame behind concrete mortar application, Mosaics made of parapets, recessed joints made of corrugated surface of the stone wall, Making Cure, Making the joint relief stone wall surface, Concrete road construction in the cylinder cycles have Sıkıştrıl, Floor coverings made of, Epoxy based flooring made, Whitewash and oil paint scraper, Made protective coat, Machine made with alum, Made of rough plaster, Made with satin plaster coating, Satin plaster coating made of, Machine made plaster ceilings with plaster, 500 Dose Hydraulic Lime Mortar Bond Making, Dose 225 Reinforced Cement Lime Mortar Making, Lime Mortar Making, Bond Fill Hydraulic Lime Mortar, Plaster scraper made of, Making the Rough Blasting Painting, Soil drainage is done, Soil drainage is done, Geotechnical Investigation and Studies, the lining of the front surface, filling of joints, Gutter paving laying, Cover Installation, Removal of pavement BORDUUR, Gutter channels made from stone, parquet flooring in stone ramp, Paver flooring, Instead of laying curbs, laying groove move andesite, Floor coverings made of, Floor Covering Making, Paver flooring applications sandy, Machine excavation, excavation with shovel, of cleaning after the excavation, make Leveling, paving the machine, irrigation and compression done, By providing gravel, paving machines, filling made with lightweight aggregates, Excavations intermittently coated wood shoring done, frequent excavations made wooden shoring, fully coated wood shoring excavations done, By providing sand, paving machines, Machine mire and clay excavation (free excavation), To fill the ditch and Čukarica, withdrawal of pipes, facade insulation assembly, installation of reinforcement mesh for facade, Granite plaster, Facade decorative plasters, plastering the front edge, Siding, scaffold, Installation of the connection apare, Installation of anchors, Installation of anti-sealing apparatus, Establishment of drainage systems, Placing the metal mold for landscape, Mounting grooves facade, Coating installation of, Front compliance testing done, It is covered with sandstone walls, Curb laying, the laying of cobblestones Sidewalk, laying Mesh, Mesh concrete, making soil improvement, 5cm thick coarse aggregate ser, compression Compactor, plaster machine, Fields made the cut concrete joints, A single coat plaster made, Coarse and fine plaster ceiling plaster mortar made of, Mosaic tile coatings, Installation of decorative panels of ceramic tiles, 200 mM tile assembly frieze, Tiles slope and window sills, flooring tiles, laying tiles clinker, Decorative stone pavement, the step of laying of the tiles (radius), STEP laying of the tiles (Flat), Cut (not rectified) laying the tiles, laying marble or granite, Mosaic wall coverings, laying porcelain sandstone 15mm Kalig, Expansion joint, Tile mortar (Epoxy), Grouting tiles, Karger construction done, Sticking window and door jambs made of, Wall coverings made of, Wallboard Making, Belt made, to be ready to manufacture stone rubble, The blasted done, Ceramic flooring tiles 120 cm, Minaret from another Everywhere You Move Refutation, 100 mM ceramic frieze assembly, Inspection door manufacturing and installation, Covering Making Stair Step, Making parapet, Parapet done, Making Sills, Cladding made, Making jambs, Laminate coated wall protection strip made, Mounting of a decorative tiled corner, Tile cutting and edge grinding, Installation of laying tile corner, Ceramic floor coverings, laying the tiles on the walls, Tile grout (Standard), hole in the floor for a socket or pipe, 45 degrees and the edges of washed grinding, 'Floor tiles ''pork''', Decorative plaster tiles, adhering to the walls of Gypsum brick, Ceramic Installation of baseboards, Tile grout lining, Crushed stone wall for a hole to be Discredited, Cornices made and put in place labor, Instead Kona chamfered jambs and the Making Work, Textured exterior coating of water-based, Epoxy paints made, making two coats of paint to iron surfaces against corrosion, Transparent protective done, Each breed of polished wood parquet, to be prepared on the surface of the painting process, Oil paint made, Impregnating wood with the dipping method, Driving impregnated wood manufacturing done 3 times, Preparation of plaster or stucco (interior), lining the walls and ceiling plaster work, The coated hand-curved surface, plastering the walls of the machine, The plastered ceilings machines, applying paste, plaster niches for radiators, Covering over dilatation joints made of, Made of cement screed dose, Dose leveling layer made of cement, Coarse and fine mortar made of plaster interior wall plaster, Spreading made of plaster, Facade rough and fine plastering mortar, The fill Gypsum, The lacquered with varnished wood preservative, varnishing wood surfaces, protection of wood surfaces with colored wood preservative, Saban lining, Walls, the lining of the roof (1 layer), Ceiling wallpaper, Preparation ceiling paint and wallpaper, Preparing walls for paint and wallpaper, Hidden light of the niche dekarasyon, priming and painting the water pipe, painting with water-based wall paint, staining by water-based paint the ceiling, Installation of the foam strip by means of ceiling paint, window painting, Making airless paint, Wall or ceiling of a place in güçlenderil, Plasterboard from sealing, Wall decorations, cornices and so on. mounting, staining of the wood surface, Plasterboard painting, The ceiling painting with a spray gun, acrylic sealing of adjacent ceiling tiles, Installation of the mold with a polyurethane paint and putty, Polyurethane painting, Making water-based paint, Made of synthetic dyes, Made of synthetic dyes, With mire and slime excavating machine (deep cuts), Glued carpet tiles, soft and hard questionable with excavating machine, soft and hard questionable with excavating machine, excavation machines using explosives, Making Waterproofing, Laying of geotextile, Basement walls made of thermal insulation, Two coats of waterproofing done, Single layer waterproofing done, waterproofing done in dilatation, The walls, chimneys, etc. places waterproofing construction, Curing application, Corundum aggregate surface hardened. application and curing, Thermal insulation made of plastered application, construction of a cure for new concrete surface, laying pavement for the road, paving, leveling with graders, path planning and crushed stone fill up to 15 cm, concrete pavement gravel road up to 15 cm +, Crushed stone paths, concrete, reinforcement, Gravel road, rail mining, Gravel road, rail mining, Old asphalt road debris up to 15 cm +, Gravel road, asphalt manual, Rubble road asphalt coating machine +, concrete pavement gravel road up to 30 cm +, laying a meter during road construction curbs, 150 g / m² weight laying geotextile, thermal insulation made in horizontal, laying sewer pipes 100-200 mm plastic outer, Turnkey installation of a plastic septic tanks, Drain pump installation, Carrier slab construction with concrete slab elements, Making Precast Concrete Manufacturing and assembly, Concrete cutting to thin rope, Asphalt cutting, Reinforced concrete cutting, external thermal insulation of external walls, wall cutting, cut for plumbing, Core bits with cutting, Concrete crushing, Polyurethane injection, Concrete cracking, Diamond angle, Joint cutting, done with waterproofing geomembrane, heat insulation of roofs and floors made, heat insulation of roofs and floors made, Heat and sound insulation made of sandwich system, Brick cutting, 3-meter curb-laying during road construction, Mounting the adapter plate, Strip assembly, Fitting the door stopper, Parker cleaning and varnishing, Tongued and grooved wood floor installation of, MDF plinth mounting, Parker brushing, woodblock, Polyurethane skirting installation, Plywood or OSB flooring, Floor dust and to clean up the spill, Installation of plastic plinth, laying the laminate transversely, 3 parquet floor polishing for filling cracks, The welding seams of linoleum, Painting, Floorboards installation, OSB or plywood cutting machine on the ground, Staining of the floorboard, Varnishing and sanding wooden floors, Glueless laying carpet, Plywood sanding, Installation of Aluminum baseboards, Vinyl tile installation, Up to 30 cm old asphalt gravel road +, Wood mounting, plywood floors, Path along the trough floor (labor), Wall wallpaper paste, Ceiling wallpaper paste, Fabric wallpaper paste, Liquid wallpaper paste, Vinyl wallpaper paste, glass wallpaper paste to the wall, Photo wallpaper paste, Glass ceiling wallpaper paste, Straw wallpaper paste, Laminate hardwood flooring, Silk wallpaper paste, Floor screed, waterproofing membrane assembly for SAP, floor insulation on the handle, supplements for Saban, 5 cm cement + sand screed, Self-leveling device usage, Floor sanding screed, Two coats of primer application, Polystyrene concrete screed, filling the container with self-leveling mortars ground, Installation of plastic sewer fittings, Installation of plastic sewer fittings, laying plastic outer sewer pipes 200-400 mm, laying sewer pipes plastic outer, Cork flooring is made, Gear Flooring (Ribbed Floor), the replacement of ribbed steel mesh, 14- Ø Ø 28 mm ribbed concrete steel bar application, Column and Slab Curtain Works, 8- Ø Ø 12 mm ribbed concrete steel bar application, ready-mixed concrete plant in the loss generated, Rainwater reservoir made and the fixing of, be put in place and making the window sill, Coating done and to put in place, And conducting the fixing of the gutter, Instead of mounting the gutter and made, Stove hole nozzle and valvular, Drainpipes made and the fixing of, Mounting of roof insulation, Installation of roof ventilation, Ribbed steel bars Ø 28 mm greater application, Installation of roof windows, Basic Insulation, very hard rock excavating machines (free excavation), with very hard rock excavating machine (deep cuts), with hard rock excavating machine (deep cuts), With soft rock excavation machines (deep cuts), with hard rock excavating machinery (free excavation), With soft rock excavating machine (free excavation), manual routing of soil removed from the excavation, Need not be eliminated Laying the Fine Aggregate, excavation work done in the old ruins of rubble, The original excavation of soft body walls, dig a pit for basic, filling of the foundation pit, filling works for basic, Basic mold manufacturing, Concrete preparing mortar, Clean and Waste Water Facilities, 'Excavation ''s Getting', Earthwork and Lean concrete Loss, Reinforcement to knit for basic concrete, The original size of the excavation house boundary walls, Mounting of roof battens, antiseptic applications, Installation of front roof overhang, Mold made of concrete and reinforced concrete, series molds made of wood, formwork made from steel pipe, Facade scaffold made, flat faced concrete formwork made with Plywood, Making concrete with mold tunnel mold system, placing timber on the pier suspension, series made with sheet formwork, Carcass Making Work, Global Surface Karger Building Mold Making, Flooring made of craftsmanship, Domes and vaults scaffold made of craftsmanship, All kinds of profiles, made of steel frame construction, All kinds of profiles, made of steel frame construction, Preparation of all kinds of iron profile, Preparation of all kinds of iron profile, Roof truss made and put in place., Steel arch / vault made, Steel arch / vault made, Construction for greenhouses, Installation of underground septic tanks, Installation of the septic tank cover, Installation of the septic tank manhole cover, laying of the sewer line, Septik tank menhol montajı, Handmade classic brick used in flooring, wall construction with stone Nevsehir, EPS insulated panel wall construction of ankrajlanarak, Installation of rainwater pipe or conduit, applying roof waterproofing paste, cleaning of leakage, PVC membrane assembly, repair of membrane damage, Installation of Lightning Rod, The antenna and pole mount, Crane made using the roof carrier, Making roofing, Making Mahy, Making the roof gutters, Roofing and cladding made of, rough wall, Cinder block wall, walls are constructed with limestone sand, walls made of blocks with the carrier bimsbeto, Wall made, Wall made, Wall made, with walls made of aerated concrete wall blocks, Armored bimsbeto supply and the installation location of the lintel, bearing floors made using cranes, Making the wall using cranes, Single-framed exterior walls made of, partition walls made gypsum boards, soft and hard earth excavating machines, soft and hard earth excavating machines, Mechanical hand tools, serve in the categories.

Profession

Company Info

  • Occupation / Category Finishing Construction
  • Approved Documents

    Phone Number

Find Subcontractors and Employees on Workindo!

Eb Yapi Mimarlik is registered on Workindo. You may also find the right subcontractors or be a subcontractor by registering to our platform. Workindo also lets you search for potential employees and create a team for your next project.
Register Now baret ikon