Profile Picture

Hatiç İnşaat

room

Description

Firmamızda 80 kişilik mühendis ve işçi ekibimizle kat karşılığı inşaat işleri ve taşeron işleri hizmeti vermekteyiz.

Hatiç İnşaat , Turkey at your location and Installation of pump stations, Cold room panels made of, Drilling and installation of brick box, Electrical outlets replacement, disassembly and assembly, Installation and connection of the heating towel hangers, Establishment of a complex water treatment system, Glanded circulation pump assembly, Chemical analysis of water, Cleaning the filter water injector, Adjusting the water treatment control valve, cleaning and repair of the seawater filter tank, Cleaning the brine tank, Washing the ion exchange resin, Filters control unit repair, Camera setup, Submersible pump assembly (well), Submersible pump assembly (General), Hydraulic assembly akülmülatör max 300, Installation of new water disinfectants, Ring button setup, Installation of Floor luminaires, Built-in fan mounting, Chandelier assembly, Wall lamp assembly (sconces), Sports light installation (transformer), Installation and connection of the transformer, Installation and connection of the voltage stabilizer, Installation of the sensors, Wall drilling up to 25 mm (concrete, brick), Ground Installation, remove the power cord, Removal of exposed electrical cable, Establishment Air Conditioning, Lamps, sockets, the removal of links, 1 1 living room of the home replacement power cord, 2 rooms, 1 living room of the home replacement power cord, 3 room, 1 living room of the home replacement power cord, 4 1 living room of the home replacement power cord, Installation of the soil landscape lights, supply and drainage and protection sheet instead of laying, Installation of underwater lights, Projector installation and connection, Installation of LED lamps, Improved connectivity scheme, Plant apartment to move, By providing a gravel drainage done, Removing the sewer, Instead of laying supply and drain pipes, Faucet, valve assembly, Heated towel rack mounting and installation, sealing arrival of bathtubs and shower trays, Place standing gas boiler installation up to 55 kW, Removing the gains from the ground, Heating radiator assembly, Battery connection, Laying metal and plastic heating pipes, laying heating pipes Polypropylene, Installation of Stairs, laying copper heating pipe, Bar pressurized system test 6 bar, Dual-circuit gas boiler wall mounting, Condensing boiler installation, Single-circuit gas-fired boiler wall mounting, Solid fuel boiler installation of 55 kW max, The boiler installation, Electric boiler installation, Pump installation, Washing of the heating system, By providing a sand drain made, To install the shower, Installing Kitchen doğrayıcıs, Concrete pipes grooving, Brick pipe grooving, Removing the Bath, Ceiling lights connection and installation, Removal of steel tubes cold water, Removing the Sink, Removing the Sink, Replacing the toilet fittings, Hose replacement, Pipe exchange, Siphon assembly, polypropylene laying pipes for water supply, The insulation of pipes, Bathroom Installation, Toilet Installation, Shower mixer assembly, Boiler Installation, Laundry and dishwashing establishing and connecting, Water meter installation, Installation of Riser, Installation of Riser, Collector installation, Collector installation, Sanitary shower installation, laying copper pipes for water supply, installation of electrical outlets and switches, Installing the connection box brick, Attaching the concrete drilling and box, The welding seams of linoleum, Painting, Floorboards installation, OSB or plywood cutting machine on the ground, Staining of the floorboard, Varnishing and sanding wooden floors, Glueless laying carpet, Plywood sanding, plywood sanding with the help of putty on the ground, Installation of Aluminum baseboards, 3 parquet floor polishing for filling cracks, laminate flooring, Tension ceilings, plywood interior ceiling, ceiling bar with wood trim, Arrangement of PVC ceiling corners, Installation of the foam strips to the ceiling unpainted surfaces, Installation of ceiling moldings, Styrofoam painting, Glued carpet tiles, Texturing gypsum based plaster, Vinyl tile installation, Floor dust and to clean up the spill, supplements for Saban, 5 cm cement + sand screed, Self-leveling device usage, Floor sanding screed, Two coats of primer application, Polystyrene concrete screed, filling the container with self-leveling mortars ground, plywood floors, Laminate hardwood flooring, laying the laminate transversely, Wood mounting, Mounting the adapter plate, Strip assembly, Fitting the door stopper, Parker cleaning and varnishing, Tongued and grooved wood floor installation of, MDF plinth mounting, Parker brushing, woodblock, Polyurethane skirting installation, Plywood or OSB flooring, Installation of plastic plinth, Marble small stones (chips), American plaster, Concrete plaster effect, Granite grinding and polishing, Marble and granite cleaning, Marble and granite restoration, dusting of concrete floors, Epoxy floor paint, Electromechanical Contractor Services, Automation Services, Marble grinding and polishing, drilling depth of 2 cm for wiring in concrete, Brick drilling depth for wiring 2cm, Electricity meter connection, Installation of the machine, Installation of the power switch, Fitting the connection box to the concrete, Shan Bacau Installation, Fitting the connection box until plasterboard, Installation of the junction box and cabling, Cable inlet open fixing cables, fixing a corrugated tube with wire, Electrical panel mounting, The image quality is difficult painting, painting on the wall, 3d, people, animals and so on., Venetian plaster, Plaster Travertine, suede effect, efekt chain, Marble-looking effects, Wall wood veneer, Ceiling wood veneer, Flooring, Decorative wood panels, Wall decorative beams, Installation of Wall paneer, installation of corner panels, Plasterboard application plinth, Plaster moldings (TV unit, etc.)., Gypsum columns, Gypsum spot lights, Stucco molding applications, Painting, painting template, Charts, articles, ornaments and, drilling and installing the drywall box, the establishment of a thermostat, Turnkey boiler piping max 40 kW, Installation of the throttle, Plastic, Additional equipment and accessories, Container, Scissor structures, Prestressed beams, Bungolovlar, Garden furniture, Garden landscaping products, Garden swings, Pergolas and umbrellas, Garden lighting, Garden storage, Pots and accessories, Irrigation apparatus, Wooden structures, Sliding door, Karbon Fiber, Facade Materials, showers, saunas, Pools, Toilet bowls, urinals and bidets, Sinks and Bowls, Locks and fittings, faucets, Hand dryers, Piping, pumps, Plumbing Supplies, Water Meter Units, room, Login, towel warmer, Connectors, Garden Saws, Garden Saws, Garden machinery, determination and strategy consulting contract, Determination of procedures and contract management, Contract management, Cost control and Management, Planning and preparation work calendar, Claims and change management, Claims analysis and defense, recovery of troubled projects, Contract agents and interpret prosedürer, Determination of Risks, Contract Negotiations, Engineering Seminars, Engineering education, Molding certificate, Certification of Crane Operators, Study Pre-Contract Bidding Documents, Garden tools, order to detect the necessary materials, concrete repair mortar for concrete repairs with Surface, Crack Repair With Epoxy Injection, Mortar or mud Horosan Karger Demolition, Removing wood frame, Removing slatted wooden flooring, Wood Roof Removal, Bım Consultancy, Construction Management Services, To report that the construction site, Green Buildings & Energy Management, Geotechnical Consultancy, Pre-Construction Leasing Consultancy, Landscape Consultancy, Acoustic Consultancy, Electronics & Automation Consultancy, Communication & Wiring (Cabling) Consultancy, Material Engineering Consultancy, Fire Engineering Consultancy, Facade-Exterior Face Consultancy, Covering, Consumables, Glass, cable laying, cable routing, establishing satellite or terrestrial antenna, We pin for insertion and satellite tv, establishing amplifier, Establishing Router, wiring for Internet, Installing the connector for computers, Removing the air conditioner outdoor unit, Natural gas installation, Gas meter installation, The replacement of the gas pipe, Apartment or Room Renovation, Bathroom or Toilet Renovation, Kitchen Renovation, Bungalow Works, Precast Works, Baths and Saunas Works, Fireplaces and Stoves, natural gas pipes laid underground, Greenhouse Construction, 'Removing the air conditioner''s indoor unit', Ventilation unit for wall mounting, Approximately 300 liters of a boiler installation, Boiler copper pipes, Installation of the pump group, Heating installation was monifol, floor insulation on the handle, warm Floor, Connecting the underfloor heating temperature sensor, laying electric underfloor heating, Installation of the floor heating unit, insulation slab, Installation of air conditioning units for ceiling, installation of wall insulation and expansion joints, 6 bar pressure testing of heating systems, After 28 days after the start of heating in concrete, Installation of floor heating controller, Air Conditioning establishment between 7000 and 12000 BTU, Air Conditioning establishment between 15,000 and 18,000 BTU, 30000 BTU air conditioner establishment and above, The dismantling of the air conditioning Tamer, The establishment of a central air conditioning system, Installing air conditioning visor, According to the pipe-laying project for underfloor heating, Office works, Balcony renovating, Complete Home, Static projects, Mechanical projects, Electricity projects, Architectural projects, design with BIM, Map projects, Ground projects, Reinforced Concrete Products, Sidewalk, Roofing and waterproofing, piles, Heat Soundproofing, Iron and Steel, Paint and Equipment, Forest Products, Binding materials, Geosentetik, Prekast, Sketches, drawings and floor plans to produce, Create aesthetic and functional designs, Quality and price do research, Works Swimming Pool, Garage, Handrails and Platform Construction, Tent Making, Container Construction, Reconstruction project drawings for peace, Architectural project drawing, Historic preservation and restoration work, ROLEVET, Restitution, Architectural space arrangement, Manufacturing embodiment, Architectural landscaping, Urban design, Development planning studies, Conservation plans are, Architectural practices and management, Architectural consultancy, Creating the research and design process, do the research article for Space, sketching according to customer request, Thermostat Installation, waterproofing membrane assembly for SAP, Photo wallpaper paste, applying roof waterproofing paste, cleaning of leakage, PVC membrane assembly, repair of membrane damage, Installation of Lightning Rod, The antenna and pole mount, Crane made using the roof carrier, Making roofing, Making Mahy, Making the roof gutters, Installation of rainwater pipe or conduit, Roofing and cladding made of, rough wall, Cinder block wall, walls are constructed with limestone sand, walls made of blocks with the carrier bimsbeto, Wall made, Wall made, Wall made, with walls made of aerated concrete wall blocks, Armored bimsbeto supply and the installation location of the lintel, bearing floors made using cranes, Making the wall using cranes, Single-framed exterior walls made of, Installation of front roof overhang, Mounting of roof battens, Installation of anchors, Installation of anti-sealing apparatus, Establishment of drainage systems, Mounting grooves facade, plaster machine, Coating installation of, Front compliance testing done, It is covered with sandstone walls, Rainwater reservoir made and the fixing of, antiseptic applications, Placing of roof gutters and instead made, And conducting the fixing of the gutter, Coating done and to put in place, be put in place and making the window sill, Drainpipes made and the fixing of, Instead of mounting the gutter and made, Stove hole nozzle and valvular, Mounting of roof insulation, Installation of roof ventilation, Installation of roof windows, Roof made lighthouse bottoms and to put in place, Installation of the connection apare, partition walls made gypsum boards, wall construction with stone Nevsehir, laying sewer pipes plastic outer, laying plastic outer sewer pipes 200-400 mm, Installation of plastic sewer fittings, Installation of plastic sewer fittings, laying sewer pipes 100-200 mm plastic outer, Turnkey installation of a plastic septic tanks, Drain pump installation, Carrier slab construction with concrete slab elements, Septik tank menhol montajı, Making Precast Concrete Manufacturing and assembly, Wooden stairs to, do Stairs, make balustrades, Concrete cutting to thin rope, Asphalt cutting, Reinforced concrete cutting, wall cutting, Brick cutting, cut for plumbing, stairs, stairs, EPS insulated panel wall construction of ankrajlanarak, laying of the sewer line, Installation of the septic tank cover, Handmade classic brick used in flooring, Flooring made of craftsmanship, Mold made of concrete and reinforced concrete, series molds made of wood, formwork made from steel pipe, Facade scaffold made, flat faced concrete formwork made with Plywood, Making concrete with mold tunnel mold system, series made with sheet formwork, Installation of the septic tank manhole cover, placing timber on the pier suspension, Domes and vaults scaffold made of craftsmanship, Global Surface Karger Building Mold Making, All kinds of profiles, made of steel frame construction, All kinds of profiles, made of steel frame construction, Preparation of all kinds of iron profile, Preparation of all kinds of iron profile, Roof truss made and put in place., Steel arch / vault made, Steel arch / vault made, Construction for greenhouses, Installation of underground septic tanks, Carcass Making Work, scaffold, Siding, plastering the front edge, Gutter paving laying, Cover Installation, Removal of pavement BORDUUR, Gutter channels made from stone, parquet flooring in stone ramp, Paver flooring, Instead of laying curbs, laying groove move andesite, Floor coverings made of, Floor Covering Making, filling of joints, Machine excavation, excavation with shovel, of cleaning after the excavation, make Leveling, paving the machine, irrigation and compression done, By providing gravel, paving machines, filling made with lightweight aggregates, Excavations intermittently coated wood shoring done, frequent excavations made wooden shoring, fully coated wood shoring excavations done, By providing sand, paving machines, To fill the ditch and Čukarica, Machine mire and clay excavation (free excavation), Paver flooring applications sandy, Placing the metal mold for landscape, Geotechnical Investigation and Studies, Ground Improvement / Piling Services, Improvement ground / Piling Services, Drejing Services, Underground Drainage Services, Underground Piping & Cabling Services, Services Building Basics, Earthworks, Structural Steel Erection Services, Concrete Structures Construction Services, Siding Works, withdrawal of pipes, Services Architecture and Fine Works, Topography & Mapping Services, Curb laying, the laying of cobblestones Sidewalk, laying Mesh, Mesh concrete, making soil improvement, 5cm thick coarse aggregate ser, compression Compactor, Paving Services, With mire and slime excavating machine (deep cuts), soft and hard questionable with excavating machine, soft and hard questionable with excavating machine, soft and hard earth excavating machines, soft and hard earth excavating machines, Column and Slab Curtain Works, Cork flooring is made, Gear Flooring (Ribbed Floor), 14- Ø Ø 28 mm ribbed concrete steel bar application, Ribbed steel bars Ø 28 mm greater application, 8- Ø Ø 12 mm ribbed concrete steel bar application, ready-mixed concrete plant in the loss generated, the lining of the front surface, facade insulation assembly, installation of reinforcement mesh for facade, Granite plaster, Facade decorative plasters, the replacement of ribbed steel mesh, Basic Insulation, Reinforcement to knit for basic concrete, Earthwork and Lean concrete Loss, excavation machines using explosives, very hard rock excavating machines (free excavation), with very hard rock excavating machine (deep cuts), with hard rock excavating machine (deep cuts), With soft rock excavation machines (deep cuts), with hard rock excavating machinery (free excavation), With soft rock excavating machine (free excavation), manual routing of soil removed from the excavation, Need not be eliminated Laying the Fine Aggregate, excavation work done in the old ruins of rubble, The original excavation of soft body walls, The original size of the excavation house boundary walls, dig a pit for basic, filling of the foundation pit, filling works for basic, Basic mold manufacturing, Concrete preparing mortar, Clean and Waste Water Facilities, 'Excavation ''s Getting', Core bits with cutting, Floor screed, Polyurethane injection, Concrete cracking, Sliding wing handle instead of fitting, Replacing the transom assembly, Replacing instead of the spring hinge, Replacing the springy locking catch, lining the walls and ceiling plaster work, The fill Gypsum, The coated hand-curved surface, plastering the walls of the machine, The plastered ceilings machines, Replacing the slide, applying paste, Covering over dilatation joints made of, Made of cement screed dose, Dose leveling layer made of cement, Coarse and fine mortar made of plaster interior wall plaster, Spreading made of plaster, Facade rough and fine plastering mortar, Coarse and fine plaster ceiling plaster mortar made of, A single coat plaster made, Fields made the cut concrete joints, Soil drainage is done, Soil drainage is done, plaster niches for radiators, Making Coping, Making Coping, Replacing Stop, Replacing the hinge, protection of wood surfaces with colored wood preservative, varnishing wood surfaces, The lacquered with varnished wood preservative, Preparation of plaster or stucco (interior), Textured exterior coating of water-based, Epoxy paints made, making two coats of paint to iron surfaces against corrosion, Transparent protective done, Each breed of polished wood parquet, to be prepared on the surface of the painting process, Instead of mounting the outer door lock cylinder shaven, Impregnating wood with the dipping method, Driving impregnated wood manufacturing done 3 times, Replacing the hinge plastic coated, Replacing the hinge Height, Replacing the Fitted interior door locks, Replacing the roller Flush interior door lock, Replacing the door handles and mirrors, Replacing the rubber bumper head, Replacing latch, Oil paint made, Made of synthetic dyes, Made of synthetic dyes, Making plaster to interior and exterior surfaces, Mosaics made of parapets, Installation of drywall, Of plasterboard ceiling assembly, Drywall partition, The decor plasterboard elements (niches, belts, etc.)., Curved drywall installation, Drywall circumference of the box applications, Regulation of the drywall ceiling lighting in niches, the single layer gypsum board with mineral fiber insulation, Drywall insulating, installation of sound-proof tape on Profile, Sound absorbing ceilings or walls, Wall wallpaper paste, Ceiling wallpaper paste, Fabric wallpaper paste, Liquid wallpaper paste, Vinyl wallpaper paste, glass wallpaper paste to the wall, Glass ceiling wallpaper paste, Straw wallpaper paste, Silk wallpaper paste, Metal door frame behind concrete mortar application, Lime Crushed Stone in Wall Grout Grout the Making, Opening the joints in the wall or you move the Marble, recessed joints made of corrugated surface of the stone wall, Making the joint relief stone wall surface, Making Cure, Concrete road construction in the cylinder cycles have Sıkıştrıl, Floor coverings made of, Epoxy based flooring made, Made protective coat, Machine made with alum, Laying with geometric shaped Stonework, Made of rough plaster, Satin plaster coating made of, Machine made plaster ceilings with plaster, 500 Dose Hydraulic Lime Mortar Bond Making, Dose 225 Reinforced Cement Lime Mortar Making, Lime Mortar Making, Bond Fill Hydraulic Lime Mortar, Plaster scraper made of, Making the Rough Blasting Painting, Making Oil Paint Scraper, Whitewash and oil paint scraper, Made with satin plaster coating, Making water-based paint, Polyurethane painting, Covering Making Stair Step, Making parapet, Parapet done, Making Sills, Making jambs, Cladding made, Laminate coated wall protection strip made, Tile grout lining, Installation of laying tile corner, Ceramic floor coverings, laying the tiles on the walls, Tile grout (Standard), hole in the floor for a socket or pipe, 45 degrees and the edges of washed grinding, 'Floor tiles ''pork''', adhering to the walls of Gypsum brick, Decorative plaster tiles, Ceramic Installation of baseboards, Tile cutting and edge grinding, Inspection door manufacturing and installation, Joint cutting, Diamond angle, done with waterproofing geomembrane, heat insulation of roofs and floors made, heat insulation of roofs and floors made, Heat and sound insulation made of sandwich system, thermal insulation made in horizontal, Thermal insulation made of plastered application, external thermal insulation of external walls, 150 g / m² weight laying geotextile, Repair services, Laying of geotextile, Basement walls made of thermal insulation, Two coats of waterproofing done, Single layer waterproofing done, waterproofing done in dilatation, The walls, chimneys, etc. places waterproofing construction, Curing application, Corundum aggregate surface hardened. application and curing, construction of a cure for new concrete surface, Making Waterproofing, Mounting of a decorative tiled corner, 100 mM ceramic frieze assembly, Mosaic wall coverings, Instead Kona chamfered jambs and the Making Work, Saban lining, Walls, the lining of the roof (1 layer), Ceiling wallpaper, Preparation ceiling paint and wallpaper, Preparing walls for paint and wallpaper, Hidden light of the niche dekarasyon, priming and painting the water pipe, painting with water-based wall paint, Cornices made and put in place labor, staining by water-based paint the ceiling, window painting, Making airless paint, Plasterboard from sealing, Wall or ceiling of a place in güçlenderil, Wall decorations, cornices and so on. mounting, staining of the wood surface, Plasterboard painting, The ceiling painting with a spray gun, acrylic sealing of adjacent ceiling tiles, Installation of the mold with a polyurethane paint and putty, Installation of the foam strip by means of ceiling paint, Crushed stone wall for a hole to be Discredited, Minaret from another Everywhere You Move Refutation, The blasted done, Mosaic tile coatings, Installation of decorative panels of ceramic tiles, 200 mM tile assembly frieze, Tiles slope and window sills, flooring tiles, laying tiles clinker, Decorative stone pavement, the step of laying of the tiles (radius), STEP laying of the tiles (Flat), Cut (not rectified) laying the tiles, laying marble or granite, laying porcelain sandstone 15mm Kalig, Ceramic flooring tiles 120 cm, Expansion joint, Tile mortar (Epoxy), Grouting tiles, Karger construction done, Sticking window and door jambs made of, Wall coverings made of, Wallboard Making, Belt made, to be ready to manufacture stone rubble, Concrete crushing, serve in the categories.

Profession

Company Info

  • Occupation / Category Other
  • Approved Documents

    Phone Number

Find Subcontractors and Employees on Workindo!

Hatiç İnşaat is registered on Workindo. You may also find the right subcontractors or be a subcontractor by registering to our platform. Workindo also lets you search for potential employees and create a team for your next project.
Register Now baret ikon