Profile Picture

Inci Inşaat

room

Description

.

Inci Inşaat, Turkey at your location and Replacing the hinge plastic coated, Replacing the hinge Height, Replacing the Fitted interior door locks, Replacing the roller Flush interior door lock, Replacing the door handles and mirrors, Replacing the rubber bumper head, Replacing the hinge, Instead of mounting the outer door lock cylinder shaven, Replacing Stop, Replacing the slide, Sliding wing handle instead of fitting, Replacing latch, Driving impregnated wood manufacturing done 3 times, Oil paint made, Replacing the transom assembly, to be prepared on the surface of the painting process, Each breed of polished wood parquet, Transparent protective done, making two coats of paint to iron surfaces against corrosion, Epoxy paints made, Textured exterior coating of water-based, Preparation of plaster or stucco (interior), The lacquered with varnished wood preservative, varnishing wood surfaces, protection of wood surfaces with colored wood preservative, Made of synthetic dyes, Made of synthetic dyes, Impregnating wood with the dipping method, Replacing instead of the spring hinge, Making water-based paint, Epoxy based flooring made, Floor coverings made of, Concrete road construction in the cylinder cycles have Sıkıştrıl, Making Cure, Making the joint relief stone wall surface, recessed joints made of corrugated surface of the stone wall, Mosaics made of parapets, Metal door frame behind concrete mortar application, Making plaster to interior and exterior surfaces, Making Coping, Making Coping, Soil drainage is done, Soil drainage is done, Fields made the cut concrete joints, Replacing the springy locking catch, A single coat plaster made, Facade rough and fine plastering mortar, Spreading made of plaster, Coarse and fine mortar made of plaster interior wall plaster, Dose leveling layer made of cement, Made of cement screed dose, Covering over dilatation joints made of, plaster niches for radiators, applying paste, The plastered ceilings machines, plastering the walls of the machine, The coated hand-curved surface, The fill Gypsum, lining the walls and ceiling plaster work, Coarse and fine plaster ceiling plaster mortar made of, Installation of the mold with a polyurethane paint and putty, Made protective coat, Tile mortar (Epoxy), Expansion joint, Ceramic flooring tiles 120 cm, laying porcelain sandstone 15mm Kalig, laying marble or granite, Cut (not rectified) laying the tiles, STEP laying of the tiles (Flat), the step of laying of the tiles (radius), Decorative stone pavement, laying tiles clinker, flooring tiles, Tiles slope and window sills, 200 mM tile assembly frieze, Grouting tiles, Installation of decorative panels of ceramic tiles, Mosaic wall coverings, 100 mM ceramic frieze assembly, Mounting of a decorative tiled corner, Inspection door manufacturing and installation, Ceramic Installation of baseboards, adhering to the walls of Gypsum brick, Decorative plaster tiles, 'Floor tiles ''pork''', 45 degrees and the edges of washed grinding, hole in the floor for a socket or pipe, Tile grout (Standard), laying the tiles on the walls, Ceramic floor coverings, Mosaic tile coatings, Karger construction done, Sticking window and door jambs made of, acrylic sealing of adjacent ceiling tiles, The ceiling painting with a spray gun, Plasterboard painting, staining of the wood surface, Wall decorations, cornices and so on. mounting, Plasterboard from sealing, Wall or ceiling of a place in güçlenderil, Making airless paint, window painting, Installation of the foam strip by means of ceiling paint, staining by water-based paint the ceiling, painting with water-based wall paint, priming and painting the water pipe, Hidden light of the niche dekarasyon, Preparing walls for paint and wallpaper, Preparation ceiling paint and wallpaper, Ceiling wallpaper, Walls, the lining of the roof (1 layer), Saban lining, Instead Kona chamfered jambs and the Making Work, Cornices made and put in place labor, Crushed stone wall for a hole to be Discredited, Minaret from another Everywhere You Move Refutation, The blasted done, to be ready to manufacture stone rubble, Belt made, Wall coverings made of, Wallboard Making, Polyurethane painting, Made of rough plaster, Installation of laying tile corner, Venetian plaster, American plaster, Marble small stones (chips), Texturing gypsum based plaster, Styrofoam painting, Installation of ceiling moldings, Installation of the foam strips to the ceiling unpainted surfaces, Arrangement of PVC ceiling corners, ceiling bar with wood trim, plywood interior ceiling, Tension ceilings, Concrete plaster effect, laminate flooring, Installation of Aluminum baseboards, plywood sanding with the help of putty on the ground, Plywood sanding, Glueless laying carpet, Varnishing and sanding wooden floors, Staining of the floorboard, OSB or plywood cutting machine on the ground, Floorboards installation, Painting, The welding seams of linoleum, 3 parquet floor polishing for filling cracks, Vinyl tile installation, Glued carpet tiles, laying the laminate transversely, Plaster Travertine, efekt chain, dusting of concrete floors, Marble and granite restoration, Marble and granite cleaning, Granite grinding and polishing, Marble grinding and polishing, The image quality is difficult painting, painting on the wall, 3d, people, animals and so on., Charts, articles, ornaments and, Painting, painting template, Gypsum spot lights, suede effect, Gypsum columns, Plasterboard application plinth, Stucco molding applications, installation of corner panels, Installation of Wall paneer, Wall decorative beams, Decorative wood panels, Flooring, Ceiling wood veneer, Wall wood veneer, Marble-looking effects, Plaster moldings (TV unit, etc.)., Floor dust and to clean up the spill, Plywood or OSB flooring, Polyurethane skirting installation, Wall wallpaper paste, Sound absorbing ceilings or walls, installation of sound-proof tape on Profile, Drywall insulating, the single layer gypsum board with mineral fiber insulation, Regulation of the drywall ceiling lighting in niches, Drywall circumference of the box applications, Curved drywall installation, The decor plasterboard elements (niches, belts, etc.)., Drywall partition, Of plasterboard ceiling assembly, Installation of drywall, Ceiling wallpaper paste, Laying with geometric shaped Stonework, Opening the joints in the wall or you move the Marble, Whitewash and oil paint scraper, Making Oil Paint Scraper, Making the Rough Blasting Painting, Plaster scraper made of, Bond Fill Hydraulic Lime Mortar, Lime Mortar Making, Dose 225 Reinforced Cement Lime Mortar Making, 500 Dose Hydraulic Lime Mortar Bond Making, Machine made plaster ceilings with plaster, Satin plaster coating made of, Made with satin plaster coating, Lime Crushed Stone in Wall Grout Grout the Making, Fabric wallpaper paste, Liquid wallpaper paste, Vinyl wallpaper paste, woodblock, Parker brushing, MDF plinth mounting, Tongued and grooved wood floor installation of, Parker cleaning and varnishing, Fitting the door stopper, Strip assembly, Mounting the adapter plate, Installation of plastic plinth, Wood mounting, Laminate hardwood flooring, plywood floors, filling the container with self-leveling mortars ground, Polystyrene concrete screed, Two coats of primer application, Floor sanding screed, Self-leveling device usage, 5 cm cement + sand screed, supplements for Saban, floor insulation on the handle, waterproofing membrane assembly for SAP, Floor screed, Silk wallpaper paste, Straw wallpaper paste, Glass ceiling wallpaper paste, glass wallpaper paste to the wall, Photo wallpaper paste, Machine made with alum, Tile cutting and edge grinding, Installation of anchors, Installation of the connection apare, scaffold, Siding, plastering the front edge, Facade decorative plasters, Granite plaster, installation of reinforcement mesh for facade, facade insulation assembly, the lining of the front surface, ready-mixed concrete plant in the loss generated, 8- Ø Ø 12 mm ribbed concrete steel bar application, Installation of anti-sealing apparatus, Ribbed steel bars Ø 28 mm greater application, the replacement of ribbed steel mesh, Gear Flooring (Ribbed Floor), Cork flooring is made, Column and Slab Curtain Works, 14- Ø Ø 28 mm ribbed concrete steel bar application, Basic Insulation, Establishment of drainage systems, plaster machine, Crane made using the roof carrier, The antenna and pole mount, Installation of Lightning Rod, repair of membrane damage, PVC membrane assembly, cleaning of leakage, applying roof waterproofing paste, Installation of rainwater pipe or conduit, Installation of front roof overhang, antiseptic applications, Mounting of roof battens, Installation of roof windows, Installation of roof ventilation, Mounting grooves facade, Mounting of roof insulation, Stove hole nozzle and valvular, Instead of mounting the gutter and made, Drainpipes made and the fixing of, be put in place and making the window sill, Coating done and to put in place, And conducting the fixing of the gutter, Roof made lighthouse bottoms and to put in place, Placing of roof gutters and instead made, Rainwater reservoir made and the fixing of, It is covered with sandstone walls, Front compliance testing done, Coating installation of, Reinforcement to knit for basic concrete, Earthwork and Lean concrete Loss, 'Excavation ''s Getting', make Leveling, of cleaning after the excavation, excavation with shovel, To fill the ditch and Čukarica, Machine excavation, Floor coverings made of, Floor Covering Making, laying groove move andesite, Instead of laying curbs, Paver flooring, parquet flooring in stone ramp, Gutter channels made from stone, Removal of pavement BORDUUR, paving the machine, irrigation and compression done, Cover Installation, filling of joints, Paver flooring applications sandy, withdrawal of pipes, Placing the metal mold for landscape, compression Compactor, 5cm thick coarse aggregate ser, making soil improvement, Mesh concrete, laying Mesh, the laying of cobblestones Sidewalk, Curb laying, Gutter paving laying, By providing gravel, paving machines, filling made with lightweight aggregates, Excavations intermittently coated wood shoring done, Clean and Waste Water Facilities, Concrete preparing mortar, Basic mold manufacturing, filling works for basic, filling of the foundation pit, dig a pit for basic, The original size of the excavation house boundary walls, The original excavation of soft body walls, excavation work done in the old ruins of rubble, Need not be eliminated Laying the Fine Aggregate, manual routing of soil removed from the excavation, With soft rock excavating machine (free excavation), with hard rock excavating machinery (free excavation), With soft rock excavation machines (deep cuts), with hard rock excavating machine (deep cuts), with very hard rock excavating machine (deep cuts), very hard rock excavating machines (free excavation), excavation machines using explosives, soft and hard earth excavating machines, soft and hard earth excavating machines, soft and hard questionable with excavating machine, soft and hard questionable with excavating machine, With mire and slime excavating machine (deep cuts), Machine mire and clay excavation (free excavation), By providing sand, paving machines, fully coated wood shoring excavations done, frequent excavations made wooden shoring, Making roofing, Making Mahy, Making the roof gutters, Roofing and cladding made of, Roof cleaning winter, Blinds Installation, Strut assembly, glass cleaning team, Work at High Altitude, The walls, chimneys, etc. places waterproofing construction, waterproofing done in dilatation, Single layer waterproofing done, Two coats of waterproofing done, Basement walls made of thermal insulation, Curing application, Laying of geotextile, 150 g / m² weight laying geotextile, external thermal insulation of external walls, Thermal insulation made of plastered application, thermal insulation made in horizontal, Heat and sound insulation made of sandwich system, heat insulation of roofs and floors made, heat insulation of roofs and floors made, done with waterproofing geomembrane, Diamond angle, Joint cutting, Concrete cracking, Concrete crushing, Making Waterproofing, Corundum aggregate surface hardened. application and curing, construction of a cure for new concrete surface, Laminate coated wall protection strip made, Making jambs, Cladding made, Making Sills, Making parapet, Parapet done, Covering Making Stair Step, Repair services, Path along the trough floor (labor), 3-meter curb-laying during road construction, laying a meter during road construction curbs, Up to 30 cm old asphalt gravel road +, concrete pavement gravel road up to 30 cm +, Rubble road asphalt coating machine +, Gravel road, asphalt manual, Old asphalt road debris up to 15 cm +, Gravel road, rail mining, Gravel road, rail mining, Crushed stone paths, concrete, reinforcement, concrete pavement gravel road up to 15 cm +, path planning and crushed stone fill up to 15 cm, leveling with graders, paving, laying pavement for the road, Polyurethane injection, Tile grout lining, Core bits with cutting, Brick cutting, Domes and vaults scaffold made of craftsmanship, Carcass Making Work, placing timber on the pier suspension, series made with sheet formwork, Making concrete with mold tunnel mold system, flat faced concrete formwork made with Plywood, Facade scaffold made, formwork made from steel pipe, series molds made of wood, Mold made of concrete and reinforced concrete, Flooring made of craftsmanship, Handmade classic brick used in flooring, Global Surface Karger Building Mold Making, wall construction with stone Nevsehir, partition walls made gypsum boards, Single-framed exterior walls made of, Making the wall using cranes, bearing floors made using cranes, Armored bimsbeto supply and the installation location of the lintel, with walls made of aerated concrete wall blocks, Wall made, Wall made, Wall made, walls made of blocks with the carrier bimsbeto, walls are constructed with limestone sand, Cinder block wall, rough wall, EPS insulated panel wall construction of ankrajlanarak, All kinds of profiles, made of steel frame construction, All kinds of profiles, made of steel frame construction, Preparation of all kinds of iron profile, Preparation of all kinds of iron profile, wall cutting, Reinforced concrete cutting, Asphalt cutting, Concrete cutting to thin rope, make balustrades, do Stairs, Wooden stairs to, stairs, stairs, Making Precast Concrete Manufacturing and assembly, Carrier slab construction with concrete slab elements, Drain pump installation, Turnkey installation of a plastic septic tanks, laying sewer pipes 100-200 mm plastic outer, Installation of plastic sewer fittings, Installation of plastic sewer fittings, laying plastic outer sewer pipes 200-400 mm, laying sewer pipes plastic outer, Septik tank menhol montajı, laying of the sewer line, Installation of the septic tank manhole cover, Installation of the septic tank cover, Installation of underground septic tanks, Construction for greenhouses, Steel arch / vault made, Steel arch / vault made, Roof truss made and put in place., cut for plumbing, Epoxy floor paint, serve in the categories.

Profession

Company Info

  • Occupation / Category Rough construction
  • Approved Documents

    Phone Number

Find Subcontractors and Employees on Workindo!

Inci Inşaat is registered on Workindo. You may also find the right subcontractors or be a subcontractor by registering to our platform. Workindo also lets you search for potential employees and create a team for your next project.
Register Now baret ikon